In May 2025, I moved to Georgetown Texas, bought a residence to be closer to my 80-year-old dad,…read moreand closer to Fort Hood Military Base, for VA medical assistance. The pool needed to be resurfaced, and the pool equipment was outdated, so I started taking bids from different pool companies to have the pool project completed. The salesman's Steve with Blue Pacific Pools provided me with a f reasonable bid to complete the project, which included the re-wiring of the pools equipment which consisted of installing a new power cable through my attic and approximately 75 feet to the new pool equipment.
I was quoted a price for all the work to be completed and Steve stated that he would have his guys do a few extra things, removing two poles which were bent and removing a wooden fence. Steve the conman told me that the pool would be finished in 3 to 4 weeks, and the guys will come and start digging the trenches to install the new piping, tear down the fence so they could move the equipment to another area in the yard because I was adding on a workshop and a pool house and bathroom. I told Steve at the beginning that I needed the project completed by September 1, 2025, because I already had plans drawn up for the construction of additions and I needed to have the pool completed so construction could start. Oh yeah, Steve promised me the world, "No problem, we will have it done by the end of August 2025". Steve showed up the first day of the project and told me that I would have to pay for the extra conduit wire that what was originally agreed upon. I told him he was crazy and that was not my problem, and I wasn't going to pay for the extra conduit wire. A few days later, a crew showed up to dig the trenches, they worked four hours and left. A sub-contractor showed up named Britt and advised me that he would be doing all the electrical work and plumbing work and he lived in San Antonio, Texas, so he was only available part of the time to work on my pool. I told Britt about the conversation with Steve about the wiring and the additional utility box that needed to be installed on the opposite of the house for safety issues and for county inspection. He advised me he would talk to Steve. Five days later the trench guys come back and dug for a few hours and left. I asked one of the workers identified as Jose about the fence, he told me that he had talked to Steve and if I wanted the fence removed, I would have to pay for it. So, I paid Jose to tear down the fence. At this point the way the project was going I had a feeling that these guys where not going to finish by September 2025, and I wasn't in the position to worry about the additional work, so I paid for the fence removal in hopes they would finish. As days started going by and no one was showing up to complete the project, I started calling Steve to see what the hell was going on and why no one was showing up to work on my pool. CRICKETS!!! He never called me back, and he never showed up to check on the project. So, we started with the email game back and forth with several of the employees with Blue Pacific Pools (By the way that's a clue when a company will not return calls and only conduct business through email when a project is going on). I emailed Deborah who I guess is the account receivable employee that I want to talk the owner. The owner of Blue Pacific Pools called me and promised me the world and acted like he didn't know what was going on. He advised that he talk to Steve and have Steve send me a schedule. So, Steve sent me a schedule through email giving me the times during the week workers would show up. Guess what, even with the schedule NO ONE SHOWED UP! I received excuse after excuse and especially from Britt. At this point we are in the middle of September 2025, and only 1/3 of the pool project in completed. Deborah hit me up for another installment payment. I emailed Deborah I was not going to pay, until the pool was completed and additionally, I would start deducting $500.00 dollars a day after October 12, 2025. I then hired an attorney, and he told me that I couldn't deducted $500.00 dollars a day but not pay Blue Pacific Pools until they complete the pool project. It was first week of October 2025. They rushed through the project to get it completed by October 12, 2025, and the project was not completed correctly, and the plaster work was uneven, poorly finished, and looked terrible. I would be careful the last couple of days, Britt was showing up with a pistol on his hip, WHY? DO NOT HIRE ARE U WILL BE SORRY!