BUYER BEWARE!!!
I contracted for InSolid to provide me a seamless shower enclosure that was SUPPOSED to be completed on 05-May-2022.
05-May - William "Scott" Allen, Owner of InSolid, advised our project is still set to be completed in May 2022.
09-May - Shower pan installed.
23-May - I sent an email to InSolid after absolutely no communications from them. (18 day blackout).
26-May - The right-hand panel and the back panel of my shower enclosure was installed.
13-Jun - I contacted InSolid since I received no communications from them (19 day blackout).
30-Jun - The left-hand panel of my shower enclosure was installed. I was advised by the installation chief to let the glue permanently set for 24 hours. I hesitated to look closer at the "final" product until more than 24 hours elapsed.
04-Jul - Sent email to InSolid (owner and sales associate) since I finally looked closer at the shower enclosure, and noticed seams and chips in the wall artwork I submitted, damage to my residence, and artwork I submitted did not match the final artwork on the shower walls. An InSolid employee was scheduled to return to my residence to grout/caulk the edges of the shower enclosure for usability.
--William "Scott" Allen's response was to re-route the InSolid employee to "other work". He stated he would inspect my project the week of 05-Jul.....which didn't happen.
-----At this point, the shower enclosure was still not useable; no shower fixtures, no grouting/caulking of enclosure edges.
25-Jul - I contacted InSolid since I received no communications from them (21-day blackout).
28-Jul - Morning--Plumbing fixtures (which were sitting on the shower floor) were installed.
28-Jul - Afternoon - William "Scott" Allen assessed the status of my shower enclosure in-person and stated fixing all the issues would take one day at most.
16-Aug - William "Scott" Allen extended a discount as compensation for the inconvenience of being without a working shower. I agreed to the discount.
30-Aug - An InSolid employee grouted/caulked the edges of my shower enclosure. I needed to wait at least 24 hours prior to use shower.
GRAND TOTAL of more than 118 days of not being able to use my shower, and a grand total of 58 DAYS of absolutely NO COMMUNICATIONS from InSolid....no text, no email, no phonecall. Even if I received a text telling me I haven't been forgotten would have put my mind at ease.
14-Sep - Holes and crack in shower enclosure design noticed, and InSolid was advised.
23-Sep - William "Scott" Allen and his spouse showed up to fix stated issues (cracks, chips, wall damage, etc.). William "Scott" Allen stated the reason why my project was so delayed was due to COVID (sick personnel), equipment breakdown, change of personnel, etc. I insisted all I want is what was promised to me, a seamless shower enclosure. When I declined William "Scott" Allen's proposed resolution, he used a NUMBER OF EXPETIVES and "F-BOMBs", and stated he NEVER WANTS ANYTHING TO DO WITH MY PROJECT EVER AGAIN.
When William "Scott" Allen was departing my residence (shouting expletives and "F-Bombs" all the way to the front door), I asked Scott (over his F-Bomb-laced tirade), "So you are walking away from this project and terminating the contract?", his response was a string of more expletives and F-Bombs.
BUYER BEWARE: In my specific instance, InSolid seemed to have accepted any/all newer business and pushed my project to the much LOWER PRIORITY category. Insolid DAMAGED MY RESIDENCE (AND DIDN'T FIX IT), DAMAGED the product I contracted for (at least two dents/dings from hammers used by installers), FAILED to clean jobsite (installers dropped glue onto the shower floor, which hardened) yet FAILED TO CORRECT IT, and DID NOT provide what they were contracted for: Contract Exhibit A, para 2.:" Seam may be slightly apparent and not invisible, but will be seamless and smooth without a gap or crevice."....and my shower enclosure IS NOT SEAMLESS, HAS GAPS, HAS CREVICES, HAS A CRACK, and I now HAVE DAMAGE DONE TO MY RESIDENCE THAT INSOLID CAUSED AND DID NOT FIX!!!
All damage to my residence, my shower enclosure, and shower enclosure artwork was not caused by me. The communications blackouts (at least 58 total days) was not caused by me. Time spent waiting for my shower enclosure to be usable again (118 days) was not due to my negligence.
When I didn't agree with William "Scott" Allen's proposed potential resolution (which is my right), I was met with "F-Bombs", derision, and yelling.
I find it amazing and unfortunate an ADULT business owner would resort to juvenile behavior and language (with multiple expletives and F-Bombs) towards a customer who didn't agree with him....just sad and INEXCUSABLE.
BUYER BEWARE!! read more