Working with Graves was torture and not worth the trouble.
We signed a contract with Graves earlier this year for a renovation of a small, functional bathroom in a single family house. The estimated start date was six weeks later, estimated to be completed in three weeks.
The actual start date ended up being two weeks later than estimated and the job took two months to complete. The project was so poorly managed that the work crew (w-2 Graves employees, not subs) notified us mid-project they were quitting, but did hang on to finish our bathroom.
The main categories of failure were: a complete absence of project management, a complete absence of communication and customer service, construction errors and abandonment of a messy/ dangerous work site.
Complete Absence of Project Management
My wife and I had to spend multiple hours EACH DAY basically managing the project for Doug, who was completely absent. Graves did not know which crew was or was not coming on a given day. The crew was given no instruction, did not even have a copy of the contract or plans. Crews would constantly be asking us design questions that Doug should have communicated to them like what size and shape the faucet hole in the countertop needed to be or where the vanity was to be placed. Errors were chronic - the shower floor was initially installed the wrong size, wrong shape, with the wrong material in the wrong color. For a project that was estimated to only take three weeks to complete, parts had not even been ordered nearly two months after the original, functioning bathroom had been demolished, with Doug usually unaware that those parts were missing. Even after a shower door the incorrect size was installed and uninstalled TWICE and the newly installed tile had to be replaced because it had holes in it from the faulty shower door installation, Doug went on a vacation to the mountains instead of coming to the house in person to check on the issues. Despite the project being plagued by issues and delays over the course of months, Doug only came out to our house once to inspect the job site. When the project was completed, Doug never inspected the renovated bathroom.
Complete Absence of Communication and Customer Service
On at least eight separate occasions, we were promised a crew would come to our house for the day and when nobody showed, we never received a call, an email or a text. On another occasion, a vendor showed up to our house in person unannounced asking my wife and I what size and shape the countertop and sink needed to be.
Doug and Jamie failed to properly notify us of issues with the project. When the shower floor was installed incorrectly, Doug and Jamie were unaware and we would have to notify them. When the shower door was discovered to be the wrong size after being half installed or the countertop was delayed or the cabinet doors didn't fit, instead of Doug or Jamie notifying us of the issue, we would find out later from the crew or have to call them asking why there was a delay and nobody was showing up to finish the job. During the job, Doug and Jamie were always traveling. The entire process was torture.
Construction Errors
The project was plagued with construction errors. After the first day, the construction site was abandoned for multiple days with an active leak. The shower floor was originally installed with the wrong material, in the wrong shape, wrong size and wrong color. The shower door was half installed, then discovered to be the wrong size and uninstalled, putting holes in the brand new tile. A SECOND shower door was also half installed and discovered to be the wrong size, then uninstalled. Then the now-damaged brand new tile had to be replaced. After the third attempted installation of the shower door, it leaked. The toilet paper holder fell off the wall when I tried to put a roll of toilet paper on it. The towel bar was loose. The faucet was installed crooked and the cabinet doors promised in the contract were unavailable. The cabinet doors were eventually installed opening in the wrong direction. Progress was excruciatingly slow. To their credit, Graves did eventually fix most of their construction errors, but they resulted in preventable delay, cost and inconvenience.
Messy/ Dangerous Job Site Abandoned
A box containing razors and a bottle of some chemical with the spray nozzle removed so the bottle was wide open was left in our garage next to our two-year-old's toys for weeks. Materials were left in our garage for a week, rendering our garage unusable. As mentioned previously, the site was abandoned for multiple days while a pipe was actively leaking inside the house.
UPDATE:
Six months after the project was completed, we started receiving Final Notice, Seriously Delinquent letters addressed to Doug Graves from vendors he used on our project. read more