We've had a surprisingly disappointing experience with Three Rivers given the ratings they've received here and elsewhere. They were the most expensive of the four bids we sought, but we chose them based on their reviews and because they would utilize poured concrete footers and galvanized metal liners for the integrated planters in our deck plan. Communication at the outset was very good but quickly dwindled once work commenced, and communication is key as we are people with jobs who had to coordinate our schedules to accommodate their work. For example, on just day 2 when we were told the crew would be coming back to complete some demolition work on the existing patio, no one showed up, and when we reached out we were told that the demo contractor's work was completed so they hadn't planned on returning, contradicting what we were told.
Nonetheless we were excited to see construction unfold. We were assured that due to the complexity of design, they had assigned their best worker on the job. The crew was honest about not having cut the prior concrete patio sufficiently to meet the original design specs, and to their credit, they were giving us an extra foot of deck width (to sufficiently clear the patio) at no extra cost. That was nice. However, to the plain eye it was clear that the framing of the deck wasn't square (see photos), and when I asked why this was, I was told that there was a deformity/bowing in the concrete foundation of the house that was the cause. Absolute hogwash--the house is a new build, and there's absolutely nothing to suggest the foundation isn't straight or square (again, see photos). And of course they did not offer to rectify it. In retrospect, we should have insisted on it for the money we paid. Even if we pretend the home builders didn't make the house square (really??), shouldn't a 5-star decking company be able to easily adjust their construction to compensate??
Despite having their best worker on the job (and though we found him to be a hard worker and very nice person), there were numerous issues with fit and finish (see photos). Fascia corners were too often poorly aligned, and several deck boards were cut too short. There was noticeable bowing of the high-end PVC deck boards despite being assured they wouldn't do this. And both fascia and deck boards and railing cables have come loose in places, which we sought to remedy through a warranty claim. We understand settling happens, but the initial fit and finish was not close to commensurate with the money we paid.
During the warranty claim process, I submitted a message with requested photos of the problematic areas on Thursday, June 1. I received a message the following Monday (June 5) that their assigned crew member would be in touch by the end of the week to schedule an on-site evaluation. Fast forward two full weeks to Monday, June 19, and there's been zero communication about the status of our project. I shoot off an email inquiring and receive a reply Thursday, June 22 (three days later), that the crew member's truck had broken down and was getting fixed. Okay, stuff happens, but why was there no communication about this for two weeks until I finally had to reach out? So they set a visit for Wednesday, June 28, between 12-1pm. I say fine, but please have the crew member text my wife on the day of the visit when he has a clearer sense of his ETA, since we have a baby and want to work around his naptimes with as little disturbance as possible. "Will do!" was the emailed response.
June 28 comes, and no one arrives, texts, calls, or emails. My wife would have wanted to have gotten the assessment out of the way AS SCHEDULED and be able to run some errands, but she felt compelled to postpone them in case the crew showed up late. By late afternoon I'm fuming, and I send a firm message inquiring about the no-show and making clear that we're not happy with the repeated pattern of poor/lack of communication and outright flakiness. The next day, we're again told that their work trucks broke down and that someone will reach out to us "no later than next week." Trucks again? Really? And no one thought to contact us not to expect their SCHEDULED visit that day?
And it is now Saturday, July 8 (i.e., on the other side of "no later than next week"), and we've AGAIN received zero contact from the company. Not the crew member, not the main office. No phone call, no email, no text. Nada. We are now forced to use a different company and pay out-of-pocket for something we've already paid for and are contractually entitled to to fix the problems that Three Rivers left us with, because we're done trying to deal with this kind of disregard and slipshod work. If their objective was to shove us in the corner and make us feel like we're the lowest priority possible, they've done an exemplary job. read more