We had a GREAT team from start to finish. Sasha walked up through designs and options for our master bathroom remodel. Even the GREAT suggestion of having shelving installed on each wall after removing the Jacuzzi tub that had counter space on each end of the tub. Well I can't say enough about the results. The tub is EVERYTHING hoped for and more. My new bathroom is lovely. EVERYONE from the plumbers to the demolition crew/installers were professional and respectful of our home. The on-site project manager Joe kept things moving despite the unexpected requirement of moving plumbing. The project was completed on the commitment date. Thank you team for an AMAZING experience AND a beautiful bathroom! read more
We had Re-Bath do two bathroom remodels in our Eden Prairie 1973 home. They were great! On time, friendly, great communicators, and they made it easy for us. We felt like we were in good hands, and had a lot less to worry about.
Jack S and Yimleej Y did amazing, and I am so glad they were our guys. I'd highly recommend - especially if you get these two guys to do it! read more
I signed the contract on March 6. The install date was September 9, two weeks later than they wanted because of my schedule conflicts.
The shower replacement took two days, one for removal and one for installation. While I'm satisfied with the shower itself, I'm not satisfied with how the new shower panels match with the existing wall. The existing walls were damaged during demolition. The plastered it. An existing floor tile was broken and they tried fixing it. I should have expected some damage. What upset me the most was they didn't tell me they broke a tile. I had to discover it myself. They offered of replace it but I didn't have any extra tiles.
Their contract says they will not paint among other things they will not do.
So now I need to find a painter and hope the matched paint I bought matches the plastered area and hope the entire bathroom won't have to be painted.
I have to live with the cracked tile and the only solution to that is to re-tile the entire bathroom.
What I accepted as a very expensive shower replacement turns out to be even more expensive. read more