With Maximum Construction's (MC) help, we recently completed two bath remodels. A friend of ours was doing a major remodel at the same time as we were, and in collecting bids, we found we didn't like the contractors that came to us, for one reason of another. Either their bids were waaaaay too high, or the contractor was playing some sort of game with us, which led us to believe communication would be an issue, and their bid may suddenly sneak up in price.
The friend had talked with different contractors, and liked one to the point of almost hiring him when she got the bid of MC. She passed on the name of the one she didn't hire to us. That contractor caused delay after delay, all the while we have our toddler in daycare, paying for days when no one shows up. Meanwhile, MC was doing everything they said they were going to do on the friend's house, on time and on budget. We really wanted to fire the guy we hired and get someone else. My friend's remodel was winding down, and Tony (MC) came to bid on finishing our first bathroom. In one month, we had gone from demo to painted walls, and our current contractor was making it sound like it was going to be at least another two weeks before we could actually have something resembling a usable bathroom. Tony came in, gave us a reasonable bid to finish the first bath, and was able to start the next day on tile. While we were waiting for our bid from Tony (which took all of 24 hours), we were fired by the original contractor because he claimed he didn't bid our job right, and he was too busy working another job that was proving more profitable.
Tony came in as he said he would, and in four working days, our bathroom, while not complete, was completely usable. He gave us a bid to demo and remodel the other bathroom. We were not happy with the new bid, so he agreed to work with us on the budget. And what helped us accept the updated bid was that we knew he would show up and do the job. And he did. The second bath was far more extensive, as we were removing one closet and building another, and adding the original closet into the bathroom, and completely rearranging all the plumbing. In three weeks, we got all the way up to a usable bathroom. The only hold up to finishing was the shower door, which they were not installing. And while doing this bathroom, they put the finishing touches on the first. Had we actually stayed with the original contractor, we may have paid less overall for construction, but paid at least double for daycare (which was not cheap). The trade off was worth it to us. Tony even told us if there was a day they would not be there, so I could pull our daughter from daycare that day.
The best part, MC is fully licensed and insured. Our original contractor was licensed but not insured, and with the permit caused all kinds of problems with when he could actually be bothered to show up. But with MC, we got quality work, on time, on budget, AND we passed inspection!
Another sign that Tony is a stand up guy: During the four days they worked on our first bath, the tile guy accidentally chipped our brand new tub. Tony called me, apologized, and had already called a repair guy to come out, which he paid for in a deduction off our bill. The first contractor shoved a lot of debris down our toilet pipes, which we had to get snaked three times to resolve. He didn't let us know he did that. Tony was completely up front about the issue with the tub. I wasn't even in the house, and he could have tried to hide it, but he didn't.
We still have more work to do to our house, and Maximum Construction will be the first one we call. read more