1. Julz Corporation

0

Murrieta, CA

Julz Corporation

3.4 (23 reviews)
Closed • Closed

Request a consultation

You can now request a consultation from this business directly from Yelp

Services - Julz Corporation

Deck construction

New room addition

Julz Corporation Photos

You might also consider

Recommended Reviews - Julz Corporation

Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
Yelp app icon
Browse more easily on the app
Review Feed Illustration

Reviews With Photos

Unfinished window .. what a mess

We hired Julz through Lowe's. Even though I am very happy with the cabinet installation (their cabinet installation guy can do incredible things!), I don't recommend hiring them because of all the other issues we had with them. First of all, they rarely answer the phone, so it is impossible to know what is happening and when. When they do answer the phone, they just take a message and say they will call back. They rarely do. I have posted a photo of the unfinished window they left in my kitchen. Does that look professional to you? I have been asking them to finish the window so that I can install countertops. No response from Julz .. They also cancelled one of the vents from the central heating system. An active duct has been left by Julz inside the kitchen ceiling. I have been calling them for over a month asking to install a vent. They did promise to do it (initially), but they stopped responding to my calls as soon as they got the majority of the payment. This has been a very stressful experience. I have to keep calling and emailing them only to be ignored. I would have at least expected better and more direct communication. I am posting this review because I have no other choice. Hopefully they will see and maybe come back and finish the job.

21" Pantry Cabinet Damage

Julz Corp, as the only installer Lowe's offers, created a 7-week delay on my cabinet install. Install was quoted for 6/21-6/24 (4 days). Here's how JULZ caused the delay, including causing damage to 5 out of 26 of my cabinets (total cabinet costs over $3k for those 5). 1. The installer asked my plumber to come back to move the gas line for the oven cabinet installation. This was unnecessary. 2. The installer cut the farmhouse sink cabinet so poorly, that we had to order more trim so he could hide the bad cut (4-week delay) 3. The installer was 2.5 hours late to the site when he specifically asked my plumber to come to finish the island sink lines before he secures the island cabinets (unnecessary, again), but we needed the installer here to remove the cabinets for my plumber to do this work. 4. The installer didn't show up on 6/24 at all. 5. Installed the wrong cabinet pull on a pantry door, had to order a new door, which was incorrectly communicated to Lowes, wrong door ordered, 2-week delay. 6. Installed multiple cabinet pulls crooked. All in all, the install went from 6/21 to 8/11 until JULZ was finally done with their install. JULZ tries to pass blame onto the customer for these delays and doesn't take any responsibility/accountability for the inexperience/lack of workmanship for the install. Because the installer couldn't get the lower cabinets installed in a timely manner, my quartz installer couldn't template to begin fabrication until early JULY (2-week delay). In addition to taking 7 weeks to install cabinets quoted for only 4 days, the installer damaged the cabinets in the following ways: 1. Sink cabinet cut 2. 24" Pantry cabinet - damage to the edge of the cabinet too deep for the markup pen to cover (actual wood damage) 3. 24" Pantry cabinet - the installer cut a hole in the back of the cabinet for access to the junction box (electrical) on the wrong side of the cabinet. Had to get skin to cover it up. More damage that goes to show the inexperience/lack of care the installer uses on BRAND NEW cabinetry. 4. 42" base cabinet - same as #3 above, cut a hole in completely wrong location for access to a junction box, had to get skin to cover the damage. Also damaged the pull-out rail for this cabinet with that cut. 5. 21" Pantry cabinet - damage to the edge of the pantry cabinet too deep for the markup pen to cover, had to use trim (ordered more) to cover his damage. 6. Damage to my soffit edging. 7. Bad cut on oven cabinet that ALSO had to be hidden with more trim pieces. I had requested an inspection from the GC at JULZ, and got Isaac (the manager, not the licensed GC). When I pointed out all the damage to my BRAND NEW CABINETRY, his excuse was "well [installer] will cover it up when he's finished". Why should a customer have to have damage just covered up on BRAND NEW CABINETS? I now have NO access to the two junction boxes covered with the skin pieces unless I remove the entire skin pieces. In addition, their estimate (that I PAID through LOWE'S) included installation of "Temporary Sink and Countertop". When I questioned JULZ about when the temporary countertop, also known as plywood tops, would be installed, they said they "NEVER" install the temporary countertops! THEN WHY DID I PAY YOU TO INSTALL THEM? This ultimately cost me another $1,000 paying someone else to install them. YET, JULZ refuses to reimburse me the extra costs. So, I ultimately paid JULZ and a secondary person, for the same service. Don't charge me for a service, then NOT PROVIDE IT! The installer and JULZ Corp pass blame and use excuses to cover up their poor workmanship. I WOULD NOT RECOMMEND. Pay an actual cabinet installer who cares about his workmanship, cause JULZ sure doesn't. And this doesn't even touch on the scheduling nightmare they are and lack of communication. DO NOT RECOMMEND!

See all

2 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

2 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 1

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

2 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

4 years ago

Helpful 1
Thanks 1
Love this 0
Oh no 1

5 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

4 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

7 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

4 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

4 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

2 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0
Photo of K C.
0
2
1

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

4 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

6 years ago

They workers were on time,ready to work. Danica was always ready to help and solved problems and kept me updated on each stage.

Helpful 0
Thanks 0
Love this 0
Oh no 0

8 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

6 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

8 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

Ask the Community - Julz Corporation

Review Highlights - Julz Corporation

“Then comes Rich to do another inspection to make sure you are happy and assure that all is progressing.”

Mentioned in 6 reviews

Read more highlights

You might also consider

Verify this business for free

People searched for General Contractors 10,433 times last month within 25 miles of this business.

Verify this business

OP Flooring

OP Flooring

(43 reviews)

OP Flooring did our floors six months ago and I highly recommend them to anyone who asks. Our…read moreFloors were exactly what I wanted, the project was done on time and in budget - there were no add-on expenses or surprise charges. I received quotes from 2 other companies for my project, and OP Flooring was competitive. What really sold me was the helpful and understanding demeanor of Sheryl and her husband - as well as their excellent reviews. As a woman, sometimes contractors and workers give me a hard time for wanting things the way I want them. It was so refreshing to work with a woman-owned business. Sheryl understood our needs, answered my questions without talking down to me or making me feel silly for asking them, and just gave me an overall feeling that they were going to be easy to work with. And that feeling was 100% right! Every step of the process went smoothly, and their install team was superb! They cleaned up at the end of the day and were courteous, but most of all their craftsmanship was great. We had one spot that needed to be adjusted a few weeks after the initial install, and Sheryl and her team were out right away to fix it. All in all, I'd highly recommend OP flooring to anyone needing new flooring. I love my new floors!

OP flooring came out and gave me an estimate the same day. I was in a bind due to a slab leak. They…read morewere extremely helpful and gave me a very fair price. They were finished within the week. The owners are very honest and kind people. The floors turned out beautiful.

Julz Corporation - contractors - Updated October 2026

Loading...
Loading...
Loading...