We chose Imad and his team for our kitchen remodel when we seen his ad for a 3 day kitchen remodel. We also liked that we we're able to choose the cabinets, flooring, sink, range hood, countertops, and finishes from one place. With the help of Imad and his decorating center staff (who was very very helpful) we chose white maple cabinets with arch, quartz countertops w/6" backsplash, single bowl stainless steel sink and brushed nickel single pull faucet, stainless steel range hood, and 6"x24" Sonoma Driftwood tile.
Removal and haul away of our old kitchen was included, and most of the process went good, but with any remodel or renovation, be prepared for issues big or small. After removal of the old kitchen, the cabinets went in, then the quartz counter tops and sink, and the tile went in after. We hired our own plumber to install the new garbage disposal and new water line for our refrigerator. We purchased our new gas range from a local business nearby. All in all most of the process went well with the exception of 2 things that we're addressed and fixed.
One was that our new gas range stuck out quite a bit from the face of the cabinets after it was set in place, which was resolved by the installer having to cut back the quartz counter top in the back of the range opening by about 1 1/2 inches. The other was the range hood. After the 1st range hood was installed, it was way too low. My wife and I are not tall people, but it was so low that anyone near it would surely bump their head on it. This was due to our kitchen having an 8 inch dropped ceiling, which was not taken into consideration by Imad or us. My wife and I being first timers at having a kitchen remodeled expected things like this to be caught ahead of time by the contractor/designer since he has done so many kitchen remodels and we have not. But I must say, that Imad did absolutely everything he could to make it right, and he wanted to make sure that we we're happy. We ended up choosing a different range hood that can be adjusted for low ceilings, and we are very pleased with it.
The entire job from start to finish took about 2 1/2 weeks. I honestly did not expect it to be done in 3 days. In the end, we love our new kitchen, and appreciate Imad and his entire team for all their hard work. Lessons we're learned by us and Imad, but we are definitely happy with the end result. Thank you Imad! read more