Josh at Rayo…read moreWholesale Floor Covering Supply recommended Clean Image, Inc. to us while we were shopping for Vinyl Plank Flooring. We are so glad we found Clean Image, Inc.
Orlando and his team at Clean Image, Inc. were courteous and professional. They installed dust barriers before work began and cleaned up after themselves each day. Orlando communicated with us on the progress and if there was an unexpected delayed, he'd call as soon as he knew of the delay to keep us updated.
His expected timeline to complete the job was two weeks. He finished in 11 days, with the 11th day adding the final finishing touches, our final walk through and collecting his tools and trailer. We couldn't be happier with their work and absolutely love our remodeled home. Thank you, Orlando and your team. Couldn't have done it without you.
Details of the Installation
Clean Image, Inc. initially quoted our project in June 2025. Orlando's quote was a bit higher than others, but we felt confident Clean Image, Inc. would do a good job for us by Orlando's knowledge and by the time he spent explaining the steps required to complete the project.
Our project changed over the course of the year, but in May of 2026, we finally decided on 12 mm Luxury Vinyl Plank Flooring to be installed in our three upstairs bedrooms, two reach-in closets, hallway and on the treads of the stairway. Because our project changed a bit, the cost also came down a bit.
The installation consisted of preparing the subfloor, installing leveling compound, install the vinyl plank flooring on the upstairs floors and on the treads of our stairway, and installing baseboards in every room and painting the baseboards afterward. They also helped us install the track for the mirror closet doors in two of the bedrooms and carrying the mirrored doors upstairs and installing them for us.
We remodeled all of our second floor beyond the flooring--replacing the showers, installing new large format tile, new vanities and fixtures in both bathrooms. Because of our bathroom remodeling, we had quite a bit of trash to get rid of. Orlando set a trailer on-site for his use, but also allowed us to throw trash into it. This was very convenient and much appreciated.
Our upstairs subfloor was not flat with peaks and valleys throughout every room. Orlando installed leveling compound in each room and hallway to prepare the floor for the vinyl flooring. We also didn't want a threshold / trip hazard between the tile and the vinyl flooring. Orlando did a great job installing the leveling compound to make the two surfaces be at the same height. Because the subfloor was so badly uneven, this took about a week to complete and matched his quoted timeline.
The stair treads were tricky to install with unique angles and returns, but Orlando mastered the installation. His attention to detail on our stairs really shows. Our stairway is the show-piece in our house entrance.
We felt so comfortable with Orlando's team, we hired Jaime and Mario to move the items from our PODS in our driveway back upstairs to the bedrooms. They also assembled patio furniture for us after the PODS was empty. We carried the items downstairs to the PODS, but we weren't going to carry it back up. Lifesavers!