Final inspection on Oct 8, 2020
Contract signed on Nov 25, 2019
It took 317 days from signing the contract to the final inspection. During this period, the company folded and then was bought out by Energized Electric. Luckily for me, Energized Electric honored the contracts that were ongoing from the previous company, U.S. Generator. Prior to the buyout, US Generator was terrible. I finally called the Generac corporate office to find out they had stopped supplying generators to them due to poor business practices. When the work was started, roughly 8 months later, it was poorly planned. From the permitting and planning, to stages of installation, communication was terrible. I had to hang the permit myself after many conversations informing them of what was missing. The guys doing the work were good. The problem was after they left, communication back at the company was poor. Every time someone showed up to do the next phase, they didn't know what materials were missing to complete the job. Trying to coordinate this with the Maintenance coordinator was difficult. She was not good at her job and was combative when trying to work something out. I would avoid doing business with this branch of Energized Electric at all cost. read more