My husband and I have had 5 bathrooms remodeled by Tim, and while his work is superb, doing business with him has been...rocky and inconsistent. For the first two bathrooms, everything went pretty smoothly. There were a couple of instances where he took sick days or took off for the weekend early or didn't show up to our job without letting us know in advance, which was frustrating; it took longer than promised to finish the bathroom projects. Things happen, and everyone has a personal life, but communication is key.
When we bought our new house, we hired him to do 3 bathrooms & some tile flooring right away and the 4th bathroom at a later date. The master bath turned out beautiful as did the rest of his work, however, near the end of the job, Tim asked for $1200 more than his original bid. Since we had become friends throughout this process, he had only texted me the quotes for each bathroom and other tile areas, no formal bid was sent. He did not remember his quoted prices, and had increased his price by $750 on our master bath alone when he was asking for his progress payment. When I texted him screenshots of his original quotes and the amounts I had paid him to date, his reasoning was that the work had turned out to be more difficult than he had anticipated and more time consuming, despite being shown all materials, specs, and drawings beforehand. He also said that he had overspent on materials, and needed to pay his assistant by that weekend. We understand that things happen on a job, and there were a few extras that were added that needed compensation, but changing the total price by so much was unethical. In the end, we compensated him an extra $300 for time and materials.
When it came time to do our final bathroom six months later, we had him over beforehand to review the tub and tile design, to make sure he could complete the job as requested and revise his bid from 6 months prior if needed. We coordinated with an electrician to help get the whirlpool tub installed properly. Tim was responsible for building the framing for the tub and setting it in place, the electrician was responsible for all connections regarding the tub. Tuesday, the first day of demo went fine. The electrician came in and did the -wiring Wednesday, which unfortunately resulted in a day with no work for Tim to do because they would have been in each other's way. When he came by in the morning Thursday to pick something up, he told my husband he wasn't feeling well but that he'd be right back. He never returned and never called or texted us to say he wasn't coming back. Another day lost. The next day, Friday, he took off altogether for the Memorial weekend holiday. He said he'd be working on Monday, but again, never showed. During this time we communicated our timeline with him very clearly, saying that we were leaving on vacation in 2 weeks time and that the project needed to be completed before we left. Tim said sure, no problem, he had another job starting even before that so he would have our project completed by the end of the second week, as he himself also had a timeline to meet.
On Tuesday following Memorial day, he showed up to our house and told my husband he was backing out of the job. He didn't want to take responsibility for installing our tub as it was too complex, expensive, and too much liability. He returned $200 of our deposit to us, keeping $1000 for the 1 day of demo work he did, and some materials. My husband expressed our frustration as we had been upfront about the project's needs, and had asked him to review all the materials and fixtures ahead of time, and even told him to adjust his bid if needed. If a plumber or consultant was needed to assist him with the tub, we would have been happy to pay for that, but instead he abandoned our job altogether, which we found to be extremely unprofessional. We're reasonable, and have always paid Tim on time and accepted any normal up-charges without complaint. What he charged us to do the demo was outrageous, and now, having returned from our vacation, we are still without a bathroom as there was not time to get a new tradesmen in place before we left. We will now also end up spending more than double our original budget on the project, as there were portions that Tim would have been responsible for that now require additional subs to complete.
We are very sorry to have had our working relationship end like this, and would never want to harm someone's business, so we thought long and hard before posting this review. Overall, Tim's work is excellent, he's intuitive and thoughtful when resolving problems with installation, and is fairly priced. However, his business practices are not up to snuff, and we will be hiring another contractor for the remainder of our home projects, and no longer recommending him to friends and family. read more