I have had 10 delightful experiences with 5 star handymen and other trades on yelp.
7 weeks later and received a reply from Bob "he stated in his reply to me, "Asbestos tiles; they were loose and falling apart which is not unusual due to the age of the tiles. We had heavy work to do in the area, keeping them in preconstruction condition was near impossible"
No Starcom, the only heavy work you were to do in the washroom area, was lift up some removable self sticking modern tiles that were partially on top of the asbestos tiles. There was no heavy work you were doing in that area whatsoever. The asbestos tiles were not loose, they were documented extensively as being firmly in place due to mastic. Video, before pics, licensed people,etc.
And again, Starcom doesn't HAVE A LICENSE TO REMOVE ASBESTOS TILES.(see MD database) NOR DID they HAVE ANY APPROVAL TO DO SO. The EPA is very clear on this.
6 weeks later (April now) and still no refund after sending certified mail. Time for next formal steps to occur. Also, see hidden reviews for more info from other unhappy customers. Their reviews only auto hidden because they were 1st time Yelpers.
Had to let this contractor go. They were let go 2/16/2017.
Wish I had noticed all the hidden 1 star reviews before hiring this company.
First, their employee, Jon, handled and left unwrapped Pink Fiberglass without any type of protection in the work area. It wasn't wrapped in plastic and appeared to be old. They left unwrapped insulation sitting on the floor for a week. They stated that because the pink fiberglass has the word ECO in it that, it's safe to handle w/o gloves or eye protection. Project manager, Don, even commented that customers look at him strange when he demonstrates how safe it is by rubbing it on his skin and then starts scratching, but he knows it is safe because it is marked w/ an ECO label. As the product data sheet shows, eco means that it's merely formaldehyde free but still fiberglass !
Similarly, negotiated to have mold resistant greenboard used in place of regular drywall , but they show up with regular dry wall. Same excuse, it's "ECO", it must be same as greenboard. So a cheaper product than what was in the contract.
This is a general theme of where I negotiate for something in the contract and #STARCOM either ignored it or feigned ignorance. "Oh what, you wanted that?" "Yes, see the email we went over line by line".
Next they were supposed to put an end cap on an HVAC duct and instead the genius decided to use "Great Stuff" expandable foam INSIDE the end of the duct to close it off. Wow. The worker had such a field day he stuck the foam in all sorts of other places too; near electrical connections and it his newly added drywall joints. I don't know if he knew the HVAC was on or off when he shot that stuff in there. That would've been a mess.
The work is being done in a confined 400 sq foot space and when they were told the furnace couldn't be used (turned out to be blessing since that's a NO-NO) wanted to use an 88,000 BTU kerosene heater to cure drywall mud. We told them "nope" as we were concerned about carbon monoxide and water vapor. We supplied an electric space heater.
Part of the contract was floor installation. Despite lead time of at least a month, flooring subcontractor [ CB Flooring, currently rated a whopping 1 star on Yelp] showed up 3 days before they were scheduled to install the floor only to announce that "it would be a quite a while" before the materials would be on hand. The wood flooring was never ordered a month before.
The GC got scarce after I shared that email.
The final straw was the"Left Shark" employee who decided, with no notice or approval, to attack some asbestos flooring tiles. The plan was always to cover them up per EPA guidelines. So, the worker, Jon, knew what they were because he remarked that under his old ServPro business he would charge $5k for removal of the tiles. He knew! After a few conversations, it was reiterated over and over that he would not touch them. I went downstairs after he had left for the day and realized that he had started manually whacking at the tiles to remove them. There were still shards of the tiles laying on the floor and under nearby appliances. So a person who was well aware of hazards (and Maryland regulations, I would assume) regarding asbestos SMASHED and scraped and started to remove them. They were solidly in place, so he had to damage them to remove This is what every professional would agree is the worst case scenario when handling the substance. Without any approval at all.
The general theme of their work was that they don't care about dangerous or irritating chemicals. Drywall looks like it was laid down & mudded by monkeys. Just a nightmare I want to move on from. Apology for exposing me to asbestos and fiberglass plus a refund is all I seek. read more