We hired Cole Construction Co. to put an addition on our house in Fairfax County. It was a simple addition of 2 bedrooms and a family room off of our existing home. The project was to take about 90 days to complete. After a year and a half the project was still not completed and I had to terminate their services. During tbe construction my heat pump was removed by the HVAC subcontractor for non payment. The addition was 4 inches higher than the existing structure. One bedroom was built with the existing electric meter on the bedroom wall. Contracted materials such as Anderson Doors and windows were replaced with inferior brands. Material from my trash i.e. broken boards were used as closet shelving. After I removed them from the project I spent over $500 to finish the job. One of his employees backed into my car and they refused to pay for the damage.
When I finally sold the home I had to pay $1500 to have the circuit box corrected since the breakers did not match the circuit box ,a code violation. Also the a/c in the addition barely put out any air. Jack Cole stood on a chair touching the vent to try to feel cold air.
Stay away from this company. read more