This is The second building that we've had done by Central Oregon pole buildings. The representatives of rose always prompt and very polite and exploding things to us that I thought would be a little more complicated. The building went up and I could not ask for any better quality. But the problem arose because of the positioning of the building. Since I couldn't be on site very much, because the construction site was 25 miles from my home, I guess I have to fault myself for not paying close attention. The building was positioned 10 feet from the property line, as required but it should've been 10 feet from the house. as it ended up in your drive down the street approaching the building sits about 20° off-center from the parallel line of the house. We've tried different ways to camouflage that, but since the building was over 50 feet long and 30 feet wide, very tall. Something like that is very hard to hide. The other thing that irritated me, was the front doors open up directly to a,telephone pole that's placed directly in front of them. I would've thought they saw that telephone pole there before they made the layout of the building. read more