Cancel

    Open app

    Search

    Advance Moisture Protection

    3.2 (9 reviews)
    Closed 7:00 am - 4:00 pm

    Services - Advance Moisture Protection

    Gutter addition

    Gutter cleaning

    Gutter installation

    9 More Services

    Gutter repair

    Gutter replacement

    Roof cleaning

    Roof inspection

    New roof installation

    Roof repair

    Roof replacement

    Reroofing

    Skylight installation

    Advance Moisture Protection Photos

    You might also consider

    Recommended Reviews - Advance Moisture Protection

    Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
    Yelp app icon
    Browse more easily on the app
    Review Feed Illustration

    10 years ago

    Helpful 1
    Thanks 0
    Love this 0
    Oh no 0

    8 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    7 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    9 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    8 years ago

    Helpful 1
    Thanks 0
    Love this 0
    Oh no 0

    7 years ago

    Business owner information

    Photo of Timothy N.

    Timothy N.

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0
    Photo of Rose P.
    0
    32
    18

    8 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    8 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    8 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    Ask the Community - Advance Moisture Protection

    You might also consider

    Roofing Pups

    Roofing Pups

    3.7
    (39 reviews)

    Kelsey came to our house on Friday around 6 pm to give us an estimate to remove the solar shingles…read moreand replace with the regular asphalt shingles. She said the best way to figure out the condition of the roof is to go inside the attic and check the roof. She pulled down the attic stair and went up into the attic. She showed us the video. The entire roof condition is really bad. There are splinters and water marks on so many plywood sheets. The solar shingles are on the front and right side of the roof. My first idea was to just replace the part of the roof where the solar shingles are. Solar shingles were placed in 2014 as part of the re-roofing job. We didn't replace the plywood at that time. We went by the company who outbid the other company by 10,000$ because they said that we didn't need to replace the plywood. They just replace the old shingles with the new shingles and adding the solar shingles. They didn't show us what was happening with the plywood at that time. Kelsey was very accommodating to my idea. She said that if I insist they can replace only the half of the roof. But she showed us that some of the plywood with regular asphalt shingles on top were bowing due to the deterioration of the plywood. She reminded us that we will need to replace that part of the roof again in a couple of years. She suggested that it is better for us for the long term to replace the whole roof. If we replace only half of it, we will face the issue of not matching the color of the shingles and the roof will leak more and may create mold problems. The plywood is from the original house. It is 55 years old. I am 82 years old and my wife is 79 years old. If I replace only half of the roof, it will become the problem of our daughter and our grand-kids within few years. We decided to replace the whole roof as suggested by Kelsey, not by pressuring us but by showing the evidence and make our own decision. Then she showed us three options, the good, the better and the best. I liked some of the items in the better option and some items in the best option. She said it is possible to combine the items but she needed to talk to her boss. She called her boss right away. Shawn, her boss, created a custom option for us the way we want to combine the items. I told her some of the wordings in the contract are not clear. I want to put it in writing in the contract that all the solar related items will be removed not just the solar shingles. When she showed us the video, we saw three brand new comforters and two-wheeled child's bike in a box way back in the attic. We don't remember when we put them there. I asked her can the workers bring those things down for us because we cannot go up into the attic anymore. She said she will arrange for that. I want that in writing also. It was about 9 pm. She told us that it will be in final contract for all the things we agreed upon because the present contract options are already computerized. We signed the contract. We paid 1/3 deposit. The rest of the money will be collected when the job is completed to our satisfaction. Shawn told us that the crew will start their work on Monday. The next morning on Saturday, I texted Kelsey that I didn't receive the new contract yet. She texted me back stating that she has an appointment at 10 am for another job. She stated that when she came back from that appointment, she would finish the new contract and sent it to me. After going back and forth for a couple of times we got the final contract from her with all the wordings we want. On Sunday, she also coordinated with her production manager, Danielle. Kelsey is the person who makes this happen. She is very pleasant. She makes sure that the customer is 100% satisfied. She is the best. Danielle called me and told me that Elvin, the supervisor of the project, will call and explain to me what will be his plan of action for tomorrow. Then Elvin called me in the evening and told me that he and his crew will be at my house between 6:30 am and 7:30 am tomorrow, that is on Monday. They arrived at 7:00 am. They covered the rose bushes around our house with tarp, hanging down from the top of the roof. Elvin brought me the 3 comforters and the bike from the attic. He took 291 pictures of the project from the start to the finish and provide me a link to my e-mail so I can view the pictures and download the ones I like. He provided the link to the pictures while the job is going on, so that I can follow the progress of the work. The workers work very hard in 96 degrees temperature. They finished the job on Tuesday evening. It took 2 days for them to finish because the weather was very hot. They clean up really good after they complete the job. They picked up all the trash and nails around the house. Leo is the solar guy. He removed all the inverters and related items from the wall without damaging the brick wall. It is a joy to work with a company with dedicated employees who care for the customer.

    Chris did a excellent job with explaining the situation from what and how the process works. Thank…read moreyou for your service

    Turner Roofing

    Turner Roofing

    2.4
    (7 reviews)

    The first line of my quote says " strip roof down to the deck." Nonetheless, they did not tear off…read morethe existing roof and just put a second layer of shingles on top of what was already there. They also dropped roofing nails into the opening of my radon pump.

    I was feeling very confident that we picked out a great roofing co with turner roofing. The sales…read morerep and installers were polite and professional. Of course, as the home owner we are going on trust. Unfortunately our trust in turner roofing was unfounded. Four years later we got a leak. I called turner confident again that the roof was relatively new and surely they would stand by the lifetime guarantee. When I called turner roofing they said someone would call me back. I waited 2 weeks without hearing from them. I called back today and spoke with Melanie who kept me on hold for 15 min. I had to call back. Talked with Cathy and she said Melanie must have forgotten I was on hold! So now Cathy says there is only a 2 yr warranty on labor. This is the first we were told that!! (nowhere in the paperwork given to the home owners, me or my husband does it say that) Cathy says it will cost us $250 for someone to come out & look at it!! I ask for the manager. Also named Kathy. She says it will cost $270 to have someone come out!! Please do not assume this is an A+ contractor. They deserve an F! Extremely unsatisfied customer in Perry Hall, Md with a 4 yo roof that leaks!! Ps. They also left many many nails scattered around our yard that were found by our dog & grand kids! TR said they had a magnet on a stick and would get all the nails up for safety sake before leaving. Not.

    American Home Contractors

    American Home Contractors

    4.1
    (181 reviews)

    Had my gutters serviced today. Used the Groupon deal so it was very affordable. I called and at…read morefirst it was their answering service that answered. Apparently they are unfamiliar with the fact that they are on Groupon so I had to call back when someone from the company was in the office to get on the schedule. They had availability for two weeks later. I wasn't in a rush so I don't mind the wait. I wasn't scheduled for the 12-4 time window. On the day of I had a work commitment that came up last minute. They were very accommodating when I called so I was pushed further back on the timeslot till after 3 PM so I could be home for the service. The technician Isaiah arrived and informed me what he was going to do. Afterwards he sent me a detailed report with photographs of my gutter system. Thankfully, everything looked good and I did not require any additional services after the cleaning and tuneup.

    I am so happy with my new windows, and especially with my new sliding glass door installed my…read moreAmerican Home Contractors last week. For the first time I realize I had been hearing a fair amount of outside noise (which I'd apparently gotten used to), because these windows/doors are soundproof; now I don't hear anything at all from outside! And even better, the windows are easy to open, and my sliding glass doors actually slide well in the track, and are not shaking and drafty when it's windy outside -- major improvements from my old, builder-grade, 20+ year-old windows/sliding door. Further, the service crew was excellent -- careful, kind, professional, efficient, and they cleaned up everything afterwards. Roger, the foreman, has been doing this work for almost 30 years, and Jose, who single-handedly carried in/out the windows/doors, has been doing this work for 10+ years. I didn't get the name of the quiet third service person who was mostly outside and on the ladders, also very efficient. fyi, they did mention that working on the 4th floor of our condos from ladders was a bit more challenging as the original builder-grade windows had been made to fit by being packed/taped in place from the outside, which necessitated them having to actually break some of the glass to be able to pull the old windows out. But they did it - and did it well. Finally, Shaun, the project manager who gave me my estimate and oversaw the project from estimate, HOA approval process, to completion, was great. Highly recommended.

    Advance Moisture Protection - roofing - Updated July 2026

    Loading...
    Loading...
    Loading...