Cancel

    Open app

    Search

    Ramirez Construction

    2.3 (3 reviews)
    Closed 9:00 am - 5:30 pm

    Services - Ramirez Construction

    Ramirez Construction Photos

    You might also consider

    Recommended Reviews - Ramirez Construction

    Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
    Yelp app icon
    Browse more easily on the app
    Review Feed Illustration

    5 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    14 years ago

    Helpful 1
    Thanks 0
    Love this 0
    Oh no 0

    15 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    Ask the Community - Ramirez Construction

    You might also consider

    Verify this business for free

    Get access to customer & competitor insights.

    Verify this business

    Kingz Pool Services

    Kingz Pool Services

    (9 reviews)

    Well, unless you are willing to risk an experience like mine, don't spend any of your time with…read morethis company. Contacted them on 1/6/26, to repair an area of our pool deck that was cracked. Luis came out the next day, seemed legit, and we agreed a few days later on the work to be done and the price. He said they were a few weeks out on the schedule, which was fine with me. Contacted Kingz again on 2/4, inquiring about the start date of the project, and received no response. Contacted Kingz again on 2/6, and was told the schedule had been pushed back, due to weather. Kingz contacted me on 2/16, with a couple of potential start dates, and I chose 2/26. Kingz sent over the Docusign contract link, signed by Luis on 2/17. I signed it on 2/19, and thought we were ready to roll on 2/26. Sent a text to Kingz on 2/25, asking if everything was ready to go the following day. No answer, so sent another text at 7:21am. The answer finally came at 10:40am, stating that Kingz was working on a commercial job, and "We're unable to get started on your project at this time." They did offer me $300 for compensation for wasting my time over the previous 7 weeks, so I guess there's that. I passed, as my time is certainly worth more than that, but found out in small claims court that someone's personal time has no monetary value in cases like this, breached contract or not. My advice, if the above sounds like a bad experience, is to not spend any time with these folks. If you do go down the road with them, and again, this is solely based on my real life experience, know that the contract you sign with them might not be worth what you think it is. Kingz breached that contract by not showing up on 2/26, ("The Term"), and also by terminating the agreement when they said they weren't going to start the project at that time, (Rights of Termination). Oh, well. It's time to find a contractor that I can trust.

    I could not be more pleased with the work KINGZ Pool Services did on my pool coping and deck, and I…read morehighly recommend them! My pool originally had approximately 70% flagstone coping, while the remaining 30% had the existing concrete deck extending all the way to the edge of the pool. Over time, the concrete deck had moved and developed cracks, many of the grout lines between the flagstone coping had either cracked or was gone and the area where there was no coping had developed major cracks between the concrete cantilever and the tile line. Those cracks were allowing water to get behind the pool. KINGZ Pool Services recommended cutting back the concrete and installing Oklahoma flagstone coping around the remaining 30% of the pool and to regroup everything. I'll be honest -- I was scared to death to have someone cut into my existing pool deck! But it turned out to be the best decision I could have made. The transformation is incredible. They matched the new Oklahoma flagstone to the existing coping so well that, unless you knew there had originally been no coping in that area, you would never know it wasn't there from the beginning. They also expertly repaired the cracks in the existing concrete deck and paint-matched the repairs to the surrounding area. The result is incredibly seamless. They removed all of the old, deteriorated grout between the existing coping stones and along the tile line and re-grouted everything. They also properly cut back a line between the coping and deck so they could install mastic where it belongs. Previously, there was no mastic between the flagstone and the deck -- just grout that had worn away in many places. The entire job was completed in less than two days, and their attention to detail was outstanding. They were courteous, professional, and did an excellent job cleaning up when they were finished. They covered the pool during the work, and although there was understandably some dust left in the water, they actually got into the pool and removed the larger pieces that had fallen in. My filter and pool cleaner will take care of the remaining fine dust over the next couple of days. The quality of the workmanship, the attention to detail, the excellent color and stone matching, and the overall finished product exceeded my expectations. And they did it at a great price. If you need pool coping, deck repairs, grout or mastic work, or any of the other services they provide, I would absolutely recommend KINGZ Pool Services. I am extremely happy with the finished product and would use them again without hesitation!

    Texas Cool Pools

    Texas Cool Pools

    (4 reviews)

    We were hoping to have the perfect pool by the summer. This is what we were guaranteed by the…read moreParks. Our contract was signed in January and the pool arrived in March. We are no further along now than we were then. They have falsified dates several times of when they will be out to complete the project. When I called today (from a different number so they would answer) I was told they were finishing a project in Lubbock. According to Jim Adams (San Juan rep), Texas Cool Pools does not service that area. Dean stated they would be at our house the middle of April and this did not happen. Eric then stated in writing they would be out between May 18th and 31st and that did not happen. A friend called today and spoke with Marie about getting a new pool. She was told 8-12 weeks for the pool to be delivered and 30-45 to complete it. They are continuing to intentionally fraud people. If you are deciding which pool builder to go with, I would not choose this company. If you have recently signed a contract in the last few months, there is a good chance they were not truthful about any aspect of the process and time it will take to complete it. I have attached a picture of our pool...they simply turned it upside down in our yard.

    Texas Cool Pools, here is a Company who has no Integrity, they came out looked at my pool on a…read moreThursday and said they would be back on Friday, called me Friday morning said they had to go to Austin so would not be back here on Friday but would be back on Saturday morningor Monday morning. Monday afternoon I called and left a message and Tuesday morning I called and left a message still have not heard back from them. If you didn't want the work you should have said so instead of wasting my time. Would never do business with this company again, even if it was for free.

    Pool-ology - Pool we contracted for...

    Pool-ology

    (29 reviews)

    Pool-ology was able to make repairs the very day I called for help. Cliff, the service man, was…read morepersonable and professional as well as very helpful on pool questions I had. Pool-ology is my "Go-to pool company", for ALL THINGS related to my pool.

    RUN! We got a new fiberglass pool installed and so DISAPPOINTED!!! Concrete decking is cracking…read moreall around, has chips, and bowing. I was told cracking concrete is normal but I am pretty sure it shouldn't be cracking immediately. They put the soil (finish) down on July 3rd right before the tropical storm dropped over 5" of rain and the concrete forms were still piled up in the backyard so that area didn't get cleared or topsoil. We still had a green pool that couldn't be enjoyed over the holiday. They won't dig before rain but they will through down fresh topsoil or whatever it was but not prepared for sod and rough grade that went straight to the pool. It was also before the masonry was even started much less completed. The masonry guys got to trudge through carrying the stones. What we ended up with was a mixture of concrete, sand, gravel and rock with footprints after things dried out. We had to use a tiller/cultivator and pickaxe to try to break up the ground. The mixture of concrete, sand, gravel, and rocks broke my tiller. They shouldn't put down soil until everybody is done so that all of it is cleared up! We signed the contract 3/5/2025 and we still haven't swam in the pool for 2 primary reasons. 1 they cleaned the filters but then they got more concrete in the pool so the filters already need to be cleaned to get the concrete out. 2nd the tinker toy handrail isn't going to help me or my sister in or out of the pool (white powder coated steel ended up being white plastic that bends pretty easy and isn't long enough to help). I don't know if my pool was damaged but when the little bulldozer slid into the side wall and they had difficulty getting it out, they said it was no big deal. It feels like to me they seem to invalidate any of my concerns, they just want the money. The decking mess is probably why they push to sell the cool decking to just cover up issues.

    Ramirez Construction - hottubandpool - Updated September 2026

    Loading...
    Loading...
    Loading...