1. Fullerton Metrolink Station

0

Fullerton, CA

Cancel

Open app

Search

Fullerton Metrolink Station

3.5 (125 reviews)

Fullerton Metrolink Station Photos

You might also consider

More like Fullerton Metrolink Station

Recommended Reviews - Fullerton Metrolink Station

Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
Yelp app icon
Browse more easily on the app
Review Feed Illustration

Reviews With Photos

Danielle D.

Best Station in Socal. Food, bathrooms in the gift shop, bus connections. Elevators to get you going south on the track farthest from the cafe/gift shop. Also elevators to the northbound tracks and access to Fullerton as well. Shops nearby. Food in the cafe/gift shop is great. Good patio for train watching. Good for both metrolink and amtrak. This place rocks.

Mohammed N.

Environment was good. Service was good. Pretty cool station to chill and hang out over here pretty cool

Little restaurant
Dari P.

This is a train station. You can catch a train here or just come and watch. I saw the longest freight train ever and there were no containers on it.

Robert G.

Not the best, not the worst. It has clean bathrooms, a cafe, helpful staff, and only slightly smells like pee outside. Buena Park is a bit cleaner and more-well maintained but Fullerton is a much nicer and bigger station.

Juanwen C.

Last month I tried a new idea for hanging out with my family, which is taking a train to downtown LA. We departed from the Fullerton Train Station, conveniently located near downtown Fullerton. It was a great experience as we could easily walk to nearby restaurants for a meal or drink. Sunday parking is free. Another days have to pay $5 ish for full day parking. The station itself, including its parking lot, was impressively clean. It was easy to access, and the parking lot was conveniently situated right next to the train. The boarding area had two sides, depending on the direction your train was coming from, so make sure to figure out which side is your train. I almost miss my train because stood the wrong side.

Outdoor train museum
James A.

Serving both Metrolink and Amtrack for the Fullerton community, this station makes it both easy to drop off/pick up passengers AND park and see somebody off. My daughter takes Amtrak to see friends in San Diego, and this station is the closet/most convenient one for us from DTLB. We came a bit early to see her off, and parked in the (free but no overnight) train station customer only surface lot...plenty of space on a Friday afternoon. As you head to the station, there is an outdoor area with old locomotives and railroad car for display. This is the Fullerton Train Museum and it was closed, but you can still peek through the fence and take photos. There are 4 tracks at this station, with Track 1 and 2 on the Northside where the inside station (with a small cafe is) resides. Bathrooms and ticket purchases happen there. This is where Google Maps will direct you if you type in the station. There is a similar set-up (without the station) for Track 3 and 4, with dropoff on Walnut Avenue or parking in the nearby lot. A large pedestrian bridge (with two elevators and manual stairs) will take you across the tracks to the other side for Track 3 and 4 (and vice versa of course). The southbound Amtrak seems to consistently take Track 3, but there are lighted signs signifying which track for the next train for confirmation. There are a few places to sit on the Track 3 side, and some of it was shaded. Throughout our wait, the intercom would periodically come on and say something about the upcoming Amtrak. We heard it when stating it would be on Track 3, but as the time came closer, it stated about where you should stand....it was overly complicated and we really didn't understand. But about 10 minutes before, an employee actually came out and told people the info face to face. I thought that was really nice and great service. Basically, she wanted us to know where to stand if you were business class (the first rail car) vs coach (all the ones afterwards). It's always nice to know you are doing the correct thing. The train came right on time from the West (from the left) and the locomotive stopped under the pedestrian bridge. People were ready to get off at the exits, and there were conductors ready to help with the luggage and make sure everything was proper. Once most people got off, the conductor started to allow inbound passengers to get on (after checking their ticket). The whole process took only 5 minutes, and then they were gone. Remember the old days where you could see a visiting loved one for the maximum amount of time, by first greeting them when they exit the plane or seeing them off when they enter the plane? It wasn't a very good use of time, but often provided an inherent sense of importance (i.e. you are so important to me that I'm going to spend every last SECOND with you and make sure you leave us safely). Well, that will never happen again at airports...but you can still get that similar experience by TRAIN. And there is something to being at the station for the holidays, where you see either young people coming home to see parents, or older parents visiting to see grandchildren. We saw multiple instances of a father and young son greeting their dad/grandpa when he got off the train...so much love there and ... humor ... when the grandpa and boy are walking hand in hand in front, excitedly talking to each other, and the dad trying to keep up with all the multiple pieces of luggage trailing...haggard but with a big smile on his face watching his loved ones being together. That's Christmas.

Elisa G.

I like this Metrolink station and have taken the train here and back to SJC. It's very safe here and the town has a few great coffee spots and restaurants! I highly recommend instead of driving here.

Elevator parking garage Fullerton Station, do you wanna go there?
Robert P.

Zero quality keeping a clean parking lot. Elevator has urine on floor from homeless. .

Fullerton Bathroom windows
Venai P.

I appreciate this train is handicapped accessible as my grandmother is disabled. I ride Public transit as a college student. I like the Fullerton station because I feel I can connect to a real representative of Amtrak in order to book train Trips. I ride Metrolink as a college commuting student. I am interested in riding to Fullerton regularly as a student. I like how this station is nearby food restaurants, bars and the University.

outside

See all

9 days ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

2 months ago

Helpful 4
Thanks 1
Love this 5
Oh no 0
Photo of Margaret W.
81
711
3931

29 days ago

Came from Palm Springs by bus. Bus picked me up at the PS Airport and took me th Fullerton. On my way to Solana Beach

Helpful 0
Thanks 0
Love this 0
Oh no 0

5 months ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

1 year ago

Helpful 2
Thanks 0
Love this 2
Oh no 0
Photo of Mohammed N.
21
1013
1249

5 months ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

9 months ago

The Fullerton Metro link is always on time. It's easy to find with directions. Parking is available at all times.

Helpful 0
Thanks 0
Love this 0
Oh no 0
Photo of Daisy T.
19
51
61

5 months ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

2 years ago

Helpful 5
Thanks 1
Love this 5
Oh no 0

2 years ago

Helpful 3
Thanks 0
Love this 3
Oh no 0

3 years ago

Helpful 20
Thanks 4
Love this 21
Oh no 0
Photo of Henrey S.
16
51
20

1 year ago

Helpful 0
Thanks 0
Love this 0
Oh no 1
Photo of Kim G.
250
1140
154

2 years ago

Helpful 2
Thanks 0
Love this 0
Oh no 0

2 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Helpful 3
Thanks 2
Love this 4
Oh no 0

4 years ago

Helpful 22
Thanks 1
Love this 18
Oh no 0
Photo of Evelyn H.
2
339
185

1 year ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Helpful 1
Thanks 0
Love this 0
Oh no 1

3 years ago

Helpful 1
Thanks 0
Love this 2
Oh no 1

6 years ago

Helpful 4
Thanks 2
Love this 0
Oh no 1
Photo of Jo S.
666
2447
15470

9 years ago

Helpful 5
Thanks 0
Love this 5
Oh no 0
Photo of Scott Z.
2000
1023
653

7 years ago

Helpful 9
Thanks 1
Love this 6
Oh no 0

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Randy is an excellent attendant. Helpful, polite and very pleasant person. He made our two wait very enjoyable.

Helpful 1
Thanks 0
Love this 1
Oh no 0

12 years ago

Helpful 10
Thanks 0
Love this 10
Oh no 0
Photo of Steve F.
1093
1506
8000

12 years ago

Helpful 4
Thanks 0
Love this 3
Oh no 1

16 years ago

Helpful 2
Thanks 0
Love this 2
Oh no 0
Photo of Faye L.
724
1740
14006

10 years ago

Helpful 4
Thanks 0
Love this 1
Oh no 0

2 years ago

Helpful 2
Thanks 0
Love this 0
Oh no 0

4 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 1

4 years ago

Helpful 0
Thanks 0
Love this 1
Oh no 1

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

9 years ago

Helpful 5
Thanks 1
Love this 4
Oh no 1

7 years ago

Helpful 1
Thanks 0
Love this 0
Oh no 0

9 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 1
Photo of Ryan C.
4976
1404
8933

11 years ago

Helpful 42
Thanks 0
Love this 34
Oh no 0

15 years ago

Helpful 8
Thanks 0
Love this 6
Oh no 0

11 years ago

Helpful 6
Thanks 0
Love this 2
Oh no 0

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 1
Photo of Akiko I.
1435
1796
17194

12 years ago

Helpful 5
Thanks 0
Love this 1
Oh no 0

Page 1 of 4

Ask the Community - Fullerton Metrolink Station

I need to get to El Segundo. Will the metrolink from fullerton drop me directly at the Norwalk Station?

Yes

How strict are they on the 72-hour parking limit? I need to leave my car there for 4 days (96 hours). Also, how secure is it?

It seems to be secure. Big parking lot surrounded by other business.

View All 5 Questions

Review Highlights - Fullerton Metrolink Station

“I like the Fullerton station because I feel I can connect to a real representative of Amtrak in order to book train Trips.”

Mentioned in 14 reviews

Read more highlights

You might also consider

Verify this business for free

People searched for Public Transportation 629 times last month within 15 miles of this business.

Verify this business

OCTA Route 57 - Blue time is current expected time vs grey which was the scheduled time

OCTA Route 57

1.6(5 reviews)
1.8 mi

Be more consistent with your schedules. Its not that hard to board passengers on the bus and drop…read morethem off. This bus is also always crowded with kids from school whose parents i guess cant pick them up for some reason.

Yelp 2015 Challenge #37…read more OCTA Route 57. Or I guess, it would be the OCTA in general. Why you never on time ): There are no guarantees at all at what time that Bus Route 57 comes. It's within 10-20 minutes of the "posted" time that is on the website. Be very wary that some 57 busses stop in Fullerton before CSUF and some don't go all the way to Fashion Island! Ask the bus driver before entering. The bus runs every 30 minutes and takes you (mostly) from the Southern terminus of Fashion Island-Newport Transportation Center. It goes all the way, following CA SR-57 to the Brea Mall. It uses Jamboree to Bristol and then change paths to go up State College. It passes by South Coast Plaza and other fundertastical places xD. You definitely get a bang for your buck if you choose to spend $2 to go from FI to Brea Mall haha. It just takes up your time. Yeah the low stars are definitely for the time, but it's public transportation in the OC. It's ite. xD The busses that travel this route usually are those double busses that are connected in the middle. So there is space and they know that a lot of people have to take this bus :P If you have time and need to travel along this route, take the bus. $4 both ways ain't too shabby.

Photos
OCTA Route 57 - Current octa bus 57 (the double bus ones) much renovating. So awesome.

Current octa bus 57 (the double bus ones) much renovating. So awesome.

OCTA Route 57
OCTA Route 57

See all

Amtrak - My free drinks

Amtrak

3.3(120 reviews)
0.0 mi

We planned a trip from Fullerton to San Diego in the business class section of the train…read more I can honestly say that business class is the way to go. We had plenty of leg room, and it was a smooth ride. The train crew were polite, and super friendly. Making it a much more enjoyable experience. Not to mention the snacks they offer. That's always a plus. My only complaint and reason for 4 stars is the un-manned information booth at the Fullerton station, where our day started. We had a couple of questions because we needed assistance on where we had to board. There were no employees in sight. We found ourselves having to ask other riders if we were at the right location. Aside that little bump in the road, everything went smooth. We definitely had an awesome experience and will be looking forward to future trips on Amtrak.

This was a very nice and clean train station. Parking in the large outdoor lot is free, and the…read moresignage guiding passengers to trains is clear. There were two main issues with this station: 1. No employees were visible anywhere in the station. Many passengers felt confused about where to go or had questions regarding their trips. The sign on the information window explained that no staff were available because they were trainside- those with questions searched repeatedly for employees but found none. 2. The PA system was very hard to hear due to heavy static, and in Area 1, the Business section, messages broadcast to other parts of the loading platforms were nonexistent. Customers waiting to board tried to help each other. Despite these two issues, I would definitely use this station again.

Photos
Amtrak
Amtrak
Amtrak - San Diego here come!

See all

San Diego here come!

Fullerton Metrolink Station - publictransport - Updated October 2026

Loading...
Loading...
Loading...