I used this contractor to put in a 1000 ft of crush rock driveway, connection to the County Sewer and town water and RGE electrical line up to our future house position. The contractor has a lot of new equipment and our first meeting for a quote I was impressed by his knowledge of the job as we went over the Approved Engineering Plan (EP). He talked me into doing the job as time and material and my only concern at the time was the distance him and his workers had to travel, versus more local companies. Before I agreed to enter into a contract with him, I requested an estimate of what all the work would cost per the EP, that quote was $160,000 and I figure it up to $200,000, as that is what I had quotes from other contractors locally. Since the owner was more impressive than others I talked too, I agreed to the Time and Material cost contract, which in hind sight was a big mistake. This job included grubbing the land up to and around the future house position, along with the driveway, and utilities run from the main road and all precautions that come with a construction site. The job was supposed to be completed per the the Owner of the company by the end of October 2023. The first month went well with a few glitches, but when we got closer to the end of October with not even half the job complete, then he had help issues, equipment issues and a lot of other excuses, then it was supposed to be December, then January and it was completed by March 2024 with two main items still not completed per the EP. During this time I was supposed to be getting an itemized monthly bill to keep track of what money I was providing him. The first Invoice I received was 3 Oct, but after that I had to refuse to pay him anymore, if I did not receive an itemized bill from Oct to 31 Jan 2024. By that time I had provided him $312,000 and told him this project is way over budget and he was draining my saving that I had for building on the property. Total paid before final Itemized bill $456K itemized bill showed less. read more