Cancel

Open app

Search

Mitchell Painting

1.0 (2 reviews)

Mitchell Painting Photos

You might also consider

Recommended Reviews - Mitchell Painting

Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
Yelp app icon
Browse more easily on the app
Review Feed Illustration

6 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

8 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

You might also consider

Verify this business for free

People searched for Painters 712 times last month within 25 miles of this business.

Verify this business

Dynamic Construction Team - Stone corner for wood stove

Dynamic Construction Team

(1 review)

I hired Dynamic construction to apply permanent epoxy on my floor to line my basketball and…read morepickleball court and to remove/strip foreign substances like old tape off the floor. The price quoted for this job was 5800 dollars. The First payment of 3000 was made on 10/27/23. I wanted very good epoxy because I do park large vehicles in this area. Nick, the contractor, stated that it would be the strongest you can purchase, and it will never come off or chip. It took 2 weeks longer than what he said for the epoxy to come in. They finally started the job on Nov 14th, 2023. On the first day, they put a line in the wrong place and stripped all the concrete finish off of it. They just left it that way. I gave specific instructions for all designs and the basketball court was done wrong that day, too. Lines were uneven lengths, in the wrong space and the design was incorrect. They were here for maybe 3 hrs. that day. I figured I would fix it myself once they were done since I need this place open asap and could get to that. On Nov 16th they began stripping the concrete for the pickleball court. They proceeded to put lines in the wrong place on that too. Stripped off the protective sealer from the concrete and didn't reseal it. On Monday, Nov 20, 2023, I informed him that the white epoxy was not covering and was inconsistent in its appearance and the black was peeling in some places. He reapplied coats of epoxy and also poured it very thick in some places. On Friday Nov 24th an email regarding the black epoxy peeling off was sent. He returned on Nov 28, again, and "fixed" it. Also said that he couldn't get the substance off the floor. I guess the over-the-counter goo-gone didn't work. I could have told him that because I tried that. I figured he would do something more professional, He left several old tape marks on the floor and also spilled and walked through some of the epoxy. I went ahead and gave him the remaining 2600 dollars despite him not doing the job he agreed on. I paid the full price because I just wanted him to go and I was without my garage from 11/14/24-11/29/23 and it is essential space for two businesses. That area is also used for loading and unloading adults with disabilities, activities for adults with disabilities, and it is rented to athletic teams for practices. I could not do any of that during this time. I also had to run my heat to keep 3500 sq ft with 14 ft ceilings warm. It stayed 65 degrees in there all day, every day, for that time. Fast forward to 1/18/24. After moping the floor, I noticed a spot on the white epoxy that looked like a bubble. I scratched it with only my fingernail and a 1-inch strip just peeled right up. I was able to just pull the "Permanent epoxy" off the floor like masking tape. I inspected the rest of the white and that failure is consistent all over. I checked the black on the basketball, and several places were the same. So Dynamic construction did not do any part of this 5800 job correctly. Didn't strip anything correctly, didn't apply the epoxy correctly, there is bleeding instead of crisp lines, left tape and spilled epoxy on the floor, removed the sealer from aeras that didn't need that done, didn't repair those places and took FOREVER to do this. I do not want this guy back in my building. So the option for them to "Redo" the job is kinda a big joke. I want all my money back since that job was not done. Not one part of this job was done. He has my 5800 bucks and I have nothing. Says the epoxy was faulty. Well, that isn't my problem. You can get the money from them after you do what is right and refund me the entire cost. So now I need to figure out my lost time from rentals, extra heat costs for the days he was in there, legal fees, removal of his junk, other business costs associated with this project, and my postponement on a grand opening till probably spring since the floor will be almost impossible to keep at a warm temp in Jan and Feb. This is an indoor sports facility. Winter is peak season. I missed it. I have to reduce my rates for both pickleball and basketball at this point because I'm left with no choice. This now looks like some beat up old gym in less than 2 months. Dynamic Construction rips off their customers and doesn't care.

Mitchell Painting - painters - Updated May 2026

Loading...
Loading...
Loading...