Cancel

    Open app

    Search

    Haven Roofing

    5.0 (3 reviews)
    Open Open 24 hours

    Services - Haven Roofing

    Siding installation

    Siding repair

    Siding replacement

    Haven Roofing Photos

    You might also consider

    Recommended Reviews - Haven Roofing

    Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
    Yelp app icon
    Browse more easily on the app
    Review Feed Illustration

    3 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    2 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    3 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    You might also consider

    Verify this business for free

    People searched for Roofing 4,476 times last month within 25 miles of this business.

    Verify this business

    LA Design & Construction - Before

    LA Design & Construction

    (4 reviews)

    Flood remediation? Save yourself a lot of trouble and headaches, find a reputable company. I had…read morethe misfortune of selecting this company to do renovations in my condo that had experienced a devastating flood. Thinking there would be some economy of scale to the work, I had LA Design undertake a kitchen and master bath remodel with the remediation. The only thing this company does promptly is issue invoices. The work took 7 months to complete -- 4 more months than promised. The remediation and renovation work was terrible. Most of the kitchen cabinets were measured incorrectly and had to be re-ordered and re-installed. The brand new flooring throughout the 900 sq ft apartment was the first project completed and was, despite my repeated pleas to protect the flooring, significantly damaged with deep gouges, chips and paint splatter after being exposed to months of exposure to tools, appliances, trash and careless laborers. The living room was painted in 3 different shades of white as every day laborer and painter would just buy the white paint that was most convenient for them to pick up in the morning on their way to the job. The kitchen cabinets were never "finished" -- trim was left raw and unpainted. The plumbing work was performed with a degree of outstanding incompetence. All of the walls and ceilings that needed to be replaced due to the flood were installed with a staggering degree of sloppiness. The building maintenance team at Riva Pointe was staggered by the monumental incompetence of this company. Worst experience with a contractor -- EVER.

    We've used LA before, but this time they truly outdid themselves, so I had to leave a review. After…read morebeing left in a lurch with a sketchy contractor (trying to save money), I had cabinets, a floor plan, most parts and a window order in and waiting (with cabinets in the garage!) so we were panicking. Larry Sr came over the same day as we called to assess and give us a quote. Not only was it reasonable, but was able to use our original timeline to get everything done. Not to mention it was all done faster than the original contractor told us too. The original team was 2 guys, told us it would take 15K over our budget and over 6+ weeks. LA came in just on budget and got everything done in 13 business days. The guys they have are incredibly attentive to detail and were willing to go back in and fix up anything that was slightly off too. We also had to pivot a few minor things because the original floor plan ended up not being ideal and Larry's guys made it all happen, listening to us, making sure we felt heard and were not stressed. We are absolutely in love with the final result. While construction is definitely always stressful, LA helped reduce that as much as possible and we can't wait to use them again soon.

    Blue Nail Exteriors

    Blue Nail Exteriors

    (9 reviews)

    Working with Blue Nail was an exhausting, disappointing, and infuriating experience. Blue Nail…read morelacked professionalism, accountability, and transparency throughout. They made multiple attempts to mislead us and only followed through when faced with the possibility of legal action. Save yourself the time, money, and stress. Avoid Blue Nail at all costs. Blue Nail came recommended, so we reached out for an estimate. Early on, my father felt their team was defensive and difficult to communicate with. I didn't initially see that, so we moved forward. Our home is a Victorian farmhouse with a steep roof and a flat section where a widow's walk once existed. We wanted to restore it and initially asked them to hold off on installing EPDM in that area so we could add the posts ourselves. They declined and instead issued a change order to include the posts in their scope, which we accepted due to time constraints. After signing, we began asking about their installation method, expecting the posts to be properly framed for safety and durability. Once we started asking detailed technical questions, their demeanor noticeably shifted. Shortly thereafter, Blue Nail informed us that they intended to withdraw from the contract, citing permitting and zoning variance concerns. This was a significant red flag. It is the responsibility of any reputable contractor to verify all necessary permits and zoning requirements prior to issuing a formal proposal. We believe they had done this research but were attempting to use technical jargon to intimidate us into backing down. We investigated the variance claims ourselves and found them to be inapplicable. We confirmed with the local building department that a permit could be pulled, which we were more than willing to do. Despite all of this, Blue Nail still tried to walk away from the contract without valid justification. We were prepared for legal action after months of delays and an attempted breach of contract. Although Blue Nail eventually agreed to proceed, work didn't start until September, 4 months after our deposit. Issues: Recurring Leaks: Blue Nail had to return three times to address water intrusion in the same area--raising real concerns about long-term structural damage. As roofing contractors, your main job is to create an impervious barrier between the structure of the house and the elements. This shouldn't be an issue, let alone a recurring issue. Improper EPDM Installation: The membrane over our newly renovated bathroom was not secured to the plywood substrate. My father saw it lifting in the wind, leaving raw plywood exposed to the elements. This is an inexcusable oversight that could lead to serious water damage. We completely gut renovated this bathroom and included many layers of insulation, therefore it is hard to know if there was any immediate damage without opening up the brand new gypsum ceiling. Exterior Staircase: The debris removal process caused deep gouges and scrapes--well beyond surface damage--on our back staircase. A third-floor interior ceiling was also damaged during post installation. Cosmetic Fixes: They repainted the stairs but left a large paint stain on our concrete pad. Minor damage, but emblematic of a careless approach. Dumpster placement: the dumpster was placed on an angle in the middle of the driveway, blocking our cars in the garage making us unable to drive to work. Change Order for Soffits: They discovered extensive rot during the roof removal. We agreed to pay for repairs, but the price seemed unreasonably high. We suspect the quote was inflated due to the contentious nature of our prior interactions.

    I had a consultation with this company for new siding, new roofing, new windows, and new doors for…read moremy entire home. However, we weren't able to get too far in the consultation. Within 5 minutes of the consult I was quoted at $20,000 for just the removal of the stone siding, which is only on the front portion of my home. It is roughly a 1,800 square foot home, so pretty modest in size. I was floored at the astronomical cost for just the removal of one side. I obviously cut the consult short and wished them the best. By far the most outrageous and highest quote I received thus far.

    Haven Roofing - roofing - Updated May 2026

    Loading...
    Loading...
    Loading...