Deceptive sales with a bait and switch: After seeing their rooms online we went to tour their factory and get a preliminary quote on a design. The initial quote seemed great, and we paid a deposit to get the ball rolling. What wasn't mentioned was that Brady's work is really only about half the battle cost wise. Months after approving our design and signing our contract we got a quote from the onsite GC for what it would take to finish the project. That and all the subs (plumbing, HVAC and electric) almost doubled Brady's original quote. To be clear, since they aren't, Brady's quote covers the unfinished empty shell of the room with rough wiring, sub-floors, no siding and no dry wall. Everything else is extra.
Permit Purgatory: During the sales process we were told permits shouldn't be a problem because we were replacing an existing covered deck. We told them that the deck was built by the previous owner. Shocker it wasn't permitted. From the sounds of it the town gave them a hard time. But my biggest complaint was that during this process there was no sense of urgency or proactive communications from their "project management" team. Even when I complained and we were told there would be weekly update emails, that didn't happen. Updates seemed to only come at our prompting.
Flawed Design: Much of this is also part of their bait and switch sales process. So many of the promised design features didn't come to pass or proved to be unrealistic. First, base board heating. From the beginning that was our main plan to heat the space and Brady said they were designing for. I was told multiple times about how their factory floor could be easily pulled up to run plumbing, that wasn't the problem though. When our plumber got on site and saw the room, Brady hadn't left space under the windows for base board heaters to be installed. The walls are short, and then the electrical outlets were mounted where the heat should have gone. Second, ceiling fans were always part of the design and Brady told us repeatedly this wouldn't be a problem and ran electrical through two of the ceiling beams with drilled out holes for fans. But after you put the mounting block in, we couldn't find a single flush mounted fan that would leave enough clearance to meet code. When we tried to do just lights where the holes were, turned out the wiring in one of the beams was faulty. Brady ended up coming back to remove the wiring and "patch" the holes after we were fed up with the process. The patches themselves are as camouflaged as possible, but not unnoticeable and now our switch plates all have one blank slot because by the time this was fixed the electrical was pretty much done. Their wiring issue delayed our finish inspection by several days aside from the ongoing headache I experienced trying to find ceiling fans that would fit. Third, we were told integrating the room to our home's central air would be easy and cheaper than a mini-split. When our HVAC company came out to quote the work they told us that was a huge mistake. That our system was designed for our existing square footage, and that adding not just the additional square footage on, but one that could get so warm due to all the windows, would require replacing the entire system. So, after dry wall and everything else was done (including installing a heater in the wall because of the botched base board heat design) we ended up putting in a mini-split to cool and heat the room.
Electric: the designer/sales guy looked at our existing panel and said there was plenty of capacity. False, we needed a subpanel installed.
Problem resolution: In the end they sent us an apology from their CEO and a check for $1,500. Given how much this room cost that was slightly better than a slap in the face. I tried to let it go and wasn't going to write this review originally, however, we're still having problems months later. In the rain, the room leaks. They've been out to do some extra caulking, but today we got rain and it's leaking in the same spot.
The room looks great but Brady was horrible to work with. read more