Cant give zero stars or would...
First let me tell all those folks who gave good reviews, wish I could have warned ya first.
Now what ya should do is go back and have all the work rechecked. TRUST me. Have the wire he used checked cause ill assure you they use the cheapest wire they can, and though they say everything is done within code, be careful, they were actually going to put one of my electrical panels IN A CLOSET, oh, and they were gonna use 3 wire vs 4 to have a ground...i was not changing an outlet, switch, fixture...I was putting new electrical panels up in my apts , cause there are none, running from the main panels im the basement....anyway...
I called for an estimate and it seemed to be an annoyance when he did come I was sent a proposal, with the scope of the work but no description of type of material...here is the kicker, I always play dumb till i am ready to agree to the work, remember I said that...
I Got the estimate, asked if i can have someone stop by and show me where the chanel work was going to be done from basement up to 3rd floor, again, annoying he was asked to send someone to show me (btw, I needed to know cause I am the one who has to get a contractor to repair the walls and ceiling where the chanel is going to be done which I knew as per the estimate) so that annoyed him, the tech came we discussed where it was going that was fine, oh yeah even though they were going to try and put the panel in a closet (within code huh????)
A month later I called to redo the proposal cause I am adding now a panel in the 2nd floor as well, figured might as well (oh more buisness and money for them and again annoyed to do the new proposal) sent new proposal , a month or two later I called, and left a message and my words were "id like you to call me so we can schedule a start date" mind you start date nothing else.
He finally called me back with an attitude and said "you want me to send someone there again for a 3rd time to look" i explained no I was calling to schedule a start date.
Now remember play dumb till ready...
this is where you learn about the BS if you know how things work..I asked a simple question, let me ask what type of wire are using (folks keep in mind there are different size wires and ya dont want certain wiring especially when going up 3 floors and adding a riser to possibly add more circuit breakers and amperage later on) anyway when I asked he, (he is Frank the owner) .he got pissed that I asked that question (why'd he get pissed? well usually people get mad cause they are "caught" in BS) SO his reply was are you kidding youre going to nitpick material are you serious, we do everything to code (so to code in the wire case is the cheapest size wire allowable not what I wanted, oops, sorry, caught you on your cheapinlg out on the customers work)
than I asked how many breakers can the panel hold (again what happens if he gives me panel that only holds 8 breakers and later I wanted to add 10 more breakers) boy he really did not like these questions, one more, explanation as to why I am asking , well I want 8, 20 amp breakers and a panel that if i want to add more later I can, also want 4 wire to ground) MC 4/3 sized wire, whoooo this was not what he wanted to hear and tried to belittle me for questioing him on a $7200.00 job that involves electric in my house. Well, thats when I told him to F*** OFF, yeah I did.
Than I emailed him the next day, explaining again why I asked the questions, explained I like to keep my money im spending with business in my neighborhood with people from my neighborhood and if hed answer these questions id still like to give him my business....
Well Frank emailed back he dont want to do the job (naturally cause he now knows he cannot get over and I'm gonna pay attention to the work)...NO problem.
Moral of the story check your material he uses, check the codes for yourself, and learn a lil about the different material and options available to you before excepting a job especially from this character.
Remember tradesman think we dont know anything so they can get over, learn the basics, ask friends who know, than spring it on them.
My contractor, i told him when he did my basement, hallway and deck in the yard, after he gave me the price, I than told him I do not want any material from Home Depot. (Why? Cause its garbage, poor quality trust me) I want all my material from real lumber yards, real supply houses, and, want proof where it was bought.
That throw a monkey wrench into his profit, and he was not happy, but, the work got done at the price, with the quality I expected when spending over 150k.
Remember you're the customer these "professionals" are all over the place, there are plenty, get quotes, get prices, question, learn a little about what they are telling you, everything from scope of work to material being used, than question it agaim, don't be afraid, especially with these guys at Blaze Electric. read more