Cancel

    Open app

    Search

    Sedgewick + Ferweda Architects

    5.0 (1 review)
    Closed 8:00 am - 5:00 pm

    Services - Sedgewick + Ferweda Architects

    Architectural design

    Architectural project management

    Sedgewick + Ferweda Architects Photos

    More like Sedgewick + Ferweda Architects

    Recommended Reviews - Sedgewick + Ferweda Architects

    Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
    Yelp app icon
    Browse more easily on the app
    Review Feed Illustration

    9 months ago

    Business owner information

    Photo of Samantha S.

    Samantha S.

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    Ask the Community - Sedgewick + Ferweda Architects

    Verify this business for free

    Get access to customer & competitor insights.

    Verify this business

    Meadowlark Design + Build

    Meadowlark Design + Build

    (11 reviews)

    I would also be happy to provide a copy of the police report investigating Meadowlark for fraud,…read morethe State of Michigan LARA report which resulted in them paying a fine, and the DTE report finding that there are multiple hollow external walls in my house and that only one room in my entire house was properly insulated. Have fun trying to fire them for cause and getting sued by them when you do.

    1) Start date May 14, scheduled end date July 27 (74 days). Date they asked for final payment was…read more10/25/18 (164 days). So 90 days late, 222% beyond time budgeted. Minus 1 star for taking all damn Summer and part of the Fall. 2) Initial demo of bathroom tile on second floor shook loose a connection in the copper piping in the floor, flooding first floor and basement. Took months to get everything cleaned-up to near-original condition, required constant hounding to get their attention. Minus 1/2 star for the poor attention to a problem they created. 3) They asked for a progress payment when only 1 milestone associated with the payment was finished, a walk-through with a subcontractor. Minus 1/2 star for requesting money for nothing. 4) Remodel included repair to water-damaged ceiling in laundry room. The work was not on the original schedule, kept asking when the work would be done, they responded with, "What work?". Had to break out the contract and quote them back their scope-of-work. The project manager's response? "Wow, I didn't realize that, sorry". Paraphrasing. Minus 1/2 star for Read Your Own Damn Contract. 5) Had a gas fireplace insert installed. Three times. Installed before the wall behind was insulated and finished so it was removed for that, then re-framed and re-installed in the wrong place, had to be re-re-framed and re-re-installed. Minus 1/2 star making something simple so complicated. 6) Had portable storage pod in driveway. Had some landscaping scheduled for after the original finish date which required the pod to be gone. Project manager "guaranteed" work would be done before landscapers started, which wasn't true. Had to schlub everything back into the house where it sat piled-up and in-the-way for a month, then had to get another pod and put it all back. Minus 1/2 star for that bogus guarantee. 7) When the project was almost 60 days overdue, it took a negative post on their Facebook page to get some additional resources and oversite from the owners. Minus 1/2 star for making me complain. 8) We kept having morning meetings, sometimes changes were discussed. I'd come home to find work was done without the changes. We kept having meeting, I kept bringing up the same issues, time and time again. Minus 1/2 star for not taking notes. 9) It's the 4th of July, were on vacation in Chicago, our neighbors call and say there are 2 unmarked cargo vans at our house - is everything OK?. I call the project manager, who says there are no workers at the house, so I call the police and start scrambling - what is the best way to ruin our vacation so I can get back home fast? But - Oops! It's some painters, they're in the house, false alarm. Minus 1/2 star. 10) Had a hardwood floor put into an office space room. On a Monday, the project manager e-mailed me to say the wood would be delivered that day and installed on Wednesday. I get it, it's called "acclimating". I get home that night and the floor is down. Then it sat there for maybe a month before it being top-coated. Minus 1/2 star for what was the rush to ruin the wood? 11) The bathroom remodel is at "plumbing final inspection has passed". My wife takes a bath in her long-awaited, life-long-dream of a soaking tub. I hear it raining in the house. Something came loose, water is poring through a light fixture into the room below. The next day, the project manager - who I haven't seen in a month - comes in, doesn't say a word to me. Not, "Hey sorry this happened, glad your wife didn't get electrocuted, we'll get this fixed...", none of that. Not a word. I ask for Meadowlark to come up with a plan in writing to put GFI's on the circuits that could get flooded if this happens again. Their response displays a genuine lack of concern for my family's safety. Minus 1 star for making me so angry that I post a video of the water pouring through my ceiling to their Facebook page. 12) Lots of other issues I didn't even cover (e.g., the "4-star" painters). In their defense everything looks pretty good, finally. So plus 2 stars for that. So, unless my math is poor, that means 5 stars minus 6 stars plus 2 star = 1 star.

    Sedgewick + Ferweda Architects - architects - Updated May 2026

    Loading...
    Loading...
    Loading...