1. Right Concrete Coating

0

Tampa Bay, FL

Cancel

Open app

Search

Right Concrete Coating

3.5 (2 reviews)
Open • Open 24 hours

Services - Right Concrete Coating

Epoxy coating

Floor refinishing

Right Concrete Coating Photos

You might also consider

Recommended Reviews - Right Concrete Coating

Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
Yelp app icon
Browse more easily on the app
Review Feed Illustration

7 months ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

So nice. Makes the garage a part of the house. No more ugly oily floor. Way easier to keep clean.

Helpful 0
Thanks 0
Love this 0
Oh no 0

Ask the Community - Right Concrete Coating

You might also consider

Verify this business for free

People searched for Flooring 1,243 times last month within 25 miles of this business.

Verify this business

All Phase Paving & Sealing - Asphalt Paving Services

All Phase Paving & Sealing

(7 reviews)

Update after job completion: (added two stars for last minute effort)…read moreThe company finished the job & let us walk thru to inspect & successfully sent back a crew to do some touch up & areas that weren't completed to our satisfaction. Their striping team was phenomenal & they added a dumpster pad at no additional cost when they came back to do the touch ups rather then have a dispute if it was included in the original request by the owner. All in all I would say rough start but they came through when it was time to have a satisfied customer. A little rough around the edges but the crew was also very polite & professional. One star: I will update this again, once the job is complete. We are having an entire mobile home park repaved, or overlaid, or whatever putting new asphalt down is called. But so far I am disappointed in the take off & customer courtesy. When the manager or 'sales rep' came to meet the owner to bid a price he of course wrote a lot of notes. Then we received e-mails once or twice updating us on the delayed status of our job. A month & a half after the most recent communication of job status the workers showed up at the office asking what they needed to do. No call, no e-mail to notify us that we were on schedule so we could notify our residents, nothing. Apparently all those notes fell into a black hole & no one provided them to the guys actually about to start the job. The owner wasn't on site so we had to call him since their guy didn't bother to come out the first morning to go over the job with his own people. Day 1: Broke a water line within an hour of 'clearing' & 'preparation' (whole park without water for 2 hours) Called their office, they didn't seem concerned. When I mentioned the no call/no e-mail thing , she defended herself that we were provided a tentative schedule & then she said she called the week prior but doesn't know who she spoke with (although any other communication up to that point was all on e-mail.) Maybe, it is possible, but very unlikely in my opinion & I don't believe her. Anyway we are on Day 3 of still 'clearing' & 'preparation' When I pulled in I asked the gentleman to please let us know in the office when we need to move our cars, as today was supposed to be the start of 'new asphalt day'.... 2 hours later, backhoe within inches of one of our cars because they couldn't bother to climb off the thing to come in the office or even call. Really? If one of the girls in the office didn't notice them in the surveillance camera we wouldn't have known to go move our car. I can't wait to see what happens when they start working with hot asphalt. I am hoping this review gets better. But they are not off to an impressive start.

All Phase recently resealed, paved and re-striped and numbered the parking spaces at the 26-unit…read morecondo building where I live. What a joke. The day they were here they were using a sprayer which looked like they were doing nothing more than spraying the lot with black paint. And to see the finished product it certainly seems that's all they did because every tiny crack and every large crack is still very visible as if no asphalt at all was used. And then instead of putting the regulated 3 foot wide walkway to the mailboxes on both sides of the parking lot they did 2 feet and then took a foot off of each of the parking spaces on either side of both walkways. That means that four of the 26 spaces are much narrower than all the rest of them which has really irritated the owners. How hard is it to measure the length of a parking lot subtract 3 feet for the walkway space and then divide the rest by the number of spaces needed? Years ago, we had the parking lot sealed by a different company and they used real asphalt that covered up and sealed in all the cracks. The entire driveway was smooth as a brand new road when they were finished. This parking lot is a total disaster. Worst asphalt job I have ever seen. I saw what All Phase was doing the day they were here and they were actually spraying it on with a very fine sprayer, which did indeed look like black paint. Although obviously because of the smell, it was something related to asphalt, but very watered down it seems. Our parking lot looks as bad as it did before they started.

Right Concrete Coating - flooring - Updated October 2026

Loading...
Loading...
Loading...