Elliot, owner operator, is a really nice individual and we were happy with his design capabilities, however he failed to accurately research and check code requirements while designing the major remodel of our home. As a result we were not able to build the home we original planned and we experienced a two month delay. The delay directly costed us an additional $4,250.00 and an un-calculated amount of indirect costs. I looked into industry standards that all state that architects and building designers are responsible for ensuring that their designs meet code; in addition we had to have the plans engineered and the engineering group state that this was the responsibility of the designer/architect; same opinion was give from the city official approving the plans, and our general contractor. So I feel justified in my expectations and disappointment in Elliot's performance. read more