I paid $750 in July 2019 for preliminary structural drawings for load bearing wall removal. I requested several times for the final stamped drawing and just received it today 10/25. The preliminary drawing included an error (wall remained) and a post that I stated I did not want, however-Rich said it was necessary. Builders came in August 2019 and removed the wall/installed LVL beam and said the extra post is not needed at all. Builder contacted Rich to inform of the construction w/o the post and now I get a bill charging me for $95 for "revision" drawings.
Jocelyn, the office manager emailed me saying, "Like any other business, we have to charge for our time in order to maintain profits. Revised drawings will be released upon receipt of payment."
$750 only buys structural drawings with errors sent 3 months too late (after construction). Another $95 will get me the corrected version of the already completed construction. And I will receive it after I pay and when they are good and ready to send it, if ever at all. read more