Cancel

    Search

    Lightning Sparks

    2.3 (3 reviews)
    Open Open 24 hours

    Request quote & availability

    You can now request a quote from this business directly from Yelp

    Services - Lightning Sparks

    Circuit breaker installation

    Circuit breaker repair

    Doorbell installation

    16 More Services

    Doorbell repair

    Electric inspection

    Electric installation or replacement

    Electric panel installation

    Electric panel repair

    Electric repair

    Wire installation

    Wire repair

    Electric vehicle charging station installation

    Light fixture installation

    Light fixture repair

    Outdoor lighting installation

    Outlet installation

    Outlet repair

    Switch installation

    Switch repair

    Lightning Sparks Photos

    You might also consider

    Recommended Reviews - Lightning Sparks

    Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
    Yelp app icon
    Browse more easily on the app
    Review Feed Illustration

    1 year ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    10 months ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    10 months ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    Ask the Community - Lightning Sparks

    You might also consider

    Westcott Electric

    Westcott Electric

    (1 review)

    Westcott (Monte) came over for the initial scoping of the project, and then Jim and Mike were the…read moreelectricians who performed the upgrades over a period of two days. The project was to upgrade my old Federal Pacific 150A load center (30 circuits) with a Square-D QO 200A load center (54 spaces 64 circuits). There are now *plenty* circuit breaker spaces free for future additions, or for MWBC conversions to more modern wiring standards which use AFCI or G/AFCI (which do not, for the majority of cases, support multi wire branch circuits, aka "shared neutral", 120V-N-120V setups). Also upgraded my 150A service to 200A service. This required NYSEG to come in and hook up the new meter and such after about 2 weeks. During this period of time, the new load center was jumpered in from the old load center's range circuit breaker, via a short length of service entrance cable, hooked up into a double pole, 50A circuit breaker in the new panel. The old panel and jumper were removed by Jim as the final cleanup and finalization process. Value wise, well, I won't sugarcoat it--it was expensive. But then I realized there were 2 people who worked 20 hours over 2 days, and it was pretty hard work too, definitely they've earned it. The cleanliness and organization of the work itself was great. They used EMT conduit, junction boxes, and THHN wires running between to eliminate having to use NM wires for the ~3ft extension to the new load center's location, which would have been both ugly looking and clunky. I also had my contractor, who used to be a telecoms engineer as well as an electrician, look over their work, and he agreed it was well done.

    Lightning Sparks - electricians - Updated May 2026

    Loading...
    Loading...
    Loading...