So I am writing this review a full 2 months after my project(s) completion for two reasons; one, I have just been busy, and the other I like to wait a bit before doing a review to let things settle and see if any "issues" come up later.
First of all, I have nothing but praise for JR, and his company JR Tile. There is no "issues" that came up later after all the dust settled.
I was in the process of getting bids for a kitchen remodel with flooring. JR was recommended by my brother who got some work done in the past.
JR is a tile guy but he has recommendations for cabinetry, plumbing and countertops. So I got all of my work done on my remodel from "his guys" (except electrical which I used Penny).
In the beginning JR came in, measured floor areas and gave a quote for labor which included install and demo. His Cabinet guy comes in and measures the cabinets and a price is set for materials and labor. In my kitchen there was a little change up, instead of replacing old for new, which takes some additional planning.
We tiled the entire bottom floor of our house including kitchen approx. 1300 sqf. The process was I pick out tile, pay for it (from floor décor), and he picks it up, delivers, and has his staff work on install. It's done in sections, and it took about 5 days to complete. JR may not be there every minute of install but he comes and checks out everyday progress making sure everything is perfect. After flooring was complete, his cabinet guy came in and installed the cabinets. Now as I said before there was some changes in layout; moving built in fridge to new location, extending island, extending end of floor cabinet to fit in a built in beverage cooler. So, if you are doing some changes in the existing plan you really need to do some research on measurements, additional outlets, ect. Because basically I am the designer here, and JR tile are doing what I want them to do.
In addition to the kitchen I ended up remodeling my downstairs bathroom as well. Originally I was not going to, but when the new flooring was getting installed and a new cabinet was going in too, it just made sense to get it all done at once.
The end results are awesome! Everything turned out great! JR was easy to work with, on time appointments, always answered my calls and texts about any questions or things that I feel needed to be addressed. Our entire project too about 30 days but we were getting a lot of work done, and in addition RC Willey had a few of our new appliances on back order. It would have been ideal to have all the new appliances on hand when cabinets were getting installed but due to Covid, everything took a bit longer to get in.
Now I will say JR has a "unique/interesting" look to him, but let me say he is a True Professional and wants to do the job right, not half ass, or sloppy. For example, after flooring was complete we noticed a slight rise in one of the tiles, not sure how it happened, but he had it cut out, and replaced perfectly. We will be remodeling our upstairs bathroom next and will defiantly be using JR. read more