Cancel

    Search

    JMD Construction

    5.0 (1 review)
    Closed 7:00 am - 6:00 pm
    Updated 1 month ago

    Request a quote

    Response time

    8 hours

    Response rate

    70%

    Services - JMD Construction

    Exterior staining

    JMD Construction Photos

    You might also consider

    Recommended Reviews - JMD Construction

    Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
    Yelp app icon
    Browse more easily on the app
    Review Feed Illustration

    5 months ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    Ask the Community - JMD Construction

    Fidurko Brothers Construction - Fidurko Brothers LLC

    Fidurko Brothers Construction

    (2 reviews)

    Terrible experience. Paid $5K for a new floor to be put down in the upstairs of my house and for…read moresome new stairs to be installed. First, they put the new floor OVER the old floor upstairs when I asked for the upstairs floor to be ripped up and new floor to be installed so I lost some height in the room and by the time I noticed, it was to late for them to change anything. Then there is a somewhat difficult piece of the floor that needs to be cut and laid down and they never finished it. So I have this one section thats completely unfinished. Then the stairs they installed were supposed to be stained and sealed. They never sealed it. Also, there were pieces of wood that weren't even secured down, there's big gaps between the wall and the new staircase installed to where you can see straight down to the basement, and there are holes in the wall that they never fixed because the new staircase doesnt line up the same as the old one. I have reached out multiple times and I get told, "I am sorry I forgot all about you, I will get there as soon as I can." Just to never hear back from them. I basically got robbed for $2K because thats how much work is still needed to be finished. I have done some of the work on the stairs myself, like securing the loose boards and I had to finish staining the stairs and seal them. Whatever you do, dont hire these clowns. There are much better people in the area that actually take pride in their work and wont screw you over. I have talked to others around town and it seems this is what they do to everyone. Save yourself the headache, call someone else.

    Fidurko Brothers' Construction was contracted in July 2017 to install a concrete driveway at my…read morehome in Allegany, and I worked with Brian from this company. There were several issues with quality/workmanship- below is a list of the major issues: - Failed to put down an adequate subbase, which resulted in poor drainage under the concrete (leading to excessive heaving) and very inconsistent concrete thicknesses. I found 2-1/2" thick sidewalk concrete where it should have been 4", and areas of the driveway with 3" thick concrete where we had agreed upon 5-1/2" minimum. - Did not pin the concrete pads together, so pads could float/heave independently which created a 2" step height difference during winter. (see photo w/yellow level and measuring tape) In addition to a trip hazard, I could not plow the driveway without risking damage to concrete. - Trip hazards due to mismatched heights of concrete pads at multiple locations. (as poured, prior to winter heaving) - Refused to use rebar. (Brian referred to it as 'foreign material') - Poured concrete directly against my garage floor concrete (no expansion joint) which cracked/chipped the entire garage foundation during winter heaving. (see pic) - Concrete pads were 'pillowed' instead of being flat, creating valleys where they met. Concrete was also pitched towards my neighbor's property which directed water from my driveway towards my neighbor's garage, creating a water issue for him. Not only did this create friction between me and my neighbor, it also was a code violation. - The finish quality was extremely poor with (3) distinctly different shades of gray concrete, dips/bumps and very poor edging. (See attached pics) After 11 months of asking Brian to put his plans in writing on how he planned to correct the issues, I gave him an ultimatum. He failed to provide a corrective action plan, so I hired another contractor to make the repairs. (which resulted in complete removal/reinstallation of his concrete to put proper subbase down, and cost me over $10K)

    JMD Construction - masonry_concrete - Updated September 2026

    Loading...
    Loading...
    Loading...