We've lived here for 34 years. In all that time we've never up-dated our kitchen other than to replace appliances. In the meantime, the quarry tile floor developed many cracks. I'd resisted replacing it because of the disruption to our lives. Then the refrigerator started failing. A new one wasn't going to fit. So a cabinet had to be removed. That's when we bit the bullet and found a designer, Glen Lusby, through the "Designer-on-Call" at the Design Center at The Merchandise Mart.
He and his associate Patrick helped us decide we could update our kitchen by replacing the flooring and countertops and adding a backsplash. Ultimately we also chose a new sink and surrounded our new refrigerator in a bit of cabinetry and repainted the walls and ceiling. Glen helped us wade through the myriad materials, finishes, colors, and suppliers. Then he suggested some general contractors for us to meet. We met with three. The ABL Group wasn't the least expensive, but they made us the most confident they could complete the work as quickly as possible.
He and Patrick were involved throughout the planning and construction.
The project was completed in three weeks (except for a couple very minor touch-ups) and on budget (except for some add-ons which we approved). God forbid we have to do any further construction, but if we do we'd unhesitatingly call on Glen Lusby to help us with it. read more