This station is conveniently located in the heart of Edgewater, and CTA personnel do a pretty good job of keeping the station clean. However, as others have noted, the platform is very narrow, and unlike other nearby stations (such as Thorndale or Wilson), Granville has only one entrance and exit, which is on the north side of the platform. This results in a two-way bottleneck of people entering and exiting the station. Unfortunately this problem has become much worse since last May, when the station's lone escalator was taken out of service for repairs. This has forced both entering and exiting passengers to use the same narrow stairwell. Repairs to the escalator were originally promised to be finished by July, then the contractor pushed the date back to end of August. When August came and went, the contractor once again changed the completion date to mid-September. Mid-September came and went, and the contractor changed the completion date yet again to Oct. 31, 2023 (...beginning to see a pattern here?) It's now Nov 8th and the sign shows November 15, 2023 as the completion date, but nobody around here is holding their breath. You get used to this sort of nonsense living in a place like Chicago (who wants to make a bet that the project won't be done by next Wednesday as promised? I'll offer generous odds).
CTA has posted signage explaining why their escalators need repairs and refurbishment, and I get it. However, the signage only explains why the repairs need to be made, it does not explain why the project has taken so long to complete and why the contractor has continually pushed back their own forecasted completion date. I'm sure the contractor will offer up some lame excuse that they had to order a special part from Taiwan which is taking months to be shipped in.
I don't mind the length of time that the repairs are taking, what I do mind is that the contractor continually dangles and then revises their project completion date. Alas, this is what happens when you use union labor. There are no consequences for half-assing the job as the union will protect its members time and time again for missing deadlines which would land any private sector worker into serious trouble. You can't blame the CTA though, because if they were to hire a non-union outfit, a bunch of those overpaid union guys would be picketing outside all the CTA stations with that giant inflatable rat. So to avoid this, they just give in. This is your "Welcome to Chicago" moment, folks. The same exact thing happened at O'Hare Airport when the ATS trains were taken offline back in 2019. The project was originally supposed to take just eight months, but the contractor kept continually pushing back the completion date, and it took almost three years before the ATS trains were back up and running. And they pathetically tried to use the pandemic as the excuse for the delays, when in fact the delays began occurring long before the pandemic or lockdowns.
Sheesh. No wonder why Jack and Bobby Kennedy hated unions so much. read more