Cancel

Search

RDM Construction

4.2 (6 reviews)
Open • 9:00 am - 6:00 pm

Request a consultation

You can now request a consultation from this business directly from Yelp

Services - RDM Construction

Bathroom remodeling

Bedroom remodeling

Building additions

12 More Services

Common area remodeling

Construction design services

Deck construction

Deck design

Deck repair

Deck replacement

Garage remodeling

Kitchen remodeling

Laundry room remodeling

Remodeling

Stairway addition

Structural repair

RDM Construction Photos

You might also consider

Recommended Reviews - RDM Construction

Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
Yelp app icon
Browse more easily on the app
Review Feed Illustration

6 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

13 years ago

Helpful 3
Thanks 0
Love this 1
Oh no 0

14 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

8 years ago

Business owner information

Photo of Rick M.

Rick M.

Helpful 3
Thanks 0
Love this 0
Oh no 0

12 years ago

Helpful 2
Thanks 0
Love this 0
Oh no 0

10 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

Ask the Community - RDM Construction

You might also consider

Verify this business for free

People searched for General Contractors 723 times last month within 25 miles of this business.

Verify this business

Rockin B General Contractors

Rockin B General Contractors

(1 review)

Yelp We had a…read morelimited time frame to get a barndo built, so our research on this company was not thorough. This situation is exactly why anyone looking for a contractor should take the time to seek out and read reviews. We do not want any family to go through what we have been through over the last several months. Rockin B contracted to having our son moved in by July 14. As of today he is still not in his home. The GC was set up on a draw schedule and the bank released every draw on time and several were paid out early because he kept telling us he was out of money. The GC was asked multiple times if items such as toilets, tubs, tile, flooring, hot water heater, etc had been purchased. These are typical items in a new build outlined in a draw schedule. He assured us that all these items were purchased. The first of August we found out that he had not bought any of the material above. He then told my husband that he was out of money and we were left to finish the project out of pocket. The problems began from the start with him not overseeing the framing. When I arrived in Amarillo at the end of the framing, I noticed there was no room for a fridge. Framers had to move windows & doors. The laundry room was not framed according to plans. There was no room for the sink. Master closet had to be downsized and sink moved. The interior plumbing was all wrong. The plumber they hired plumbed for a tank water heater when a tankless was always the plan. The plumbing was not in the correct location for half bath or master, so concrete had to be busted. No dryer vent was installed. They only realized when we asked why there wasn't one. They had to cut drywall to add. Their electrician spent 8 wks in the house & was paid a lot of money. After weeks of asking, the GC finally fired him. The new electrician had to tear most everything out and made 65 drywall cuts. All the texture & painting had to be redone. The cabinets have been sanded and painted twice by their subcontractor. Several drawers & cabinets were misaligned or didn't open correctly. Cabinets were hung in the wrong place 4 different times. Our new hire had to rebuild a few door fronts due to uneven trim & a cabinet that was cracked. Spice drawers had to be rebuilt. They are now hand sanding and painting all cabinets for the 3rd time. The AC did not work after installation and we had to hire another company to come out and do the inspection and repairs. Those repairs cost us a significant amount of money to have a functioning AC. There was no duct work for bathroom vents. Vent insert for cooktop was left in kitchen with parts spread all over. Some of the windows were installed poorly and now need to be replaced. I asked the GC to contact window company back in April. I continued to remind him almost weekly to get the windows fixed or replaced. This never happened. We now have to purchase new windows and remove drywall to replace. The water & septic both failed inspection. The GC signed paperwork with the bank confirming each draw would be used appropriately and that any material kept off site was considered our property. He still has several items for our build at a location he refuses to disclose. We have had to purchase all that material (for a second time) and pay someone else to install. The contract included exterior work. Nothing has been paid for or completed outside. We will be paying for sod, landscaping, front and back porches, a driveway, wainscoting around home, and labor costs. Being that we paid him the full contracted price, our attorney has requested an accounting of the funds he received from us. After several attempts, we still have not received any accounting.

RDM Construction - contractors - Updated May 2026

Loading...
Loading...
Loading...