We got several bids on our kitchen. We went with KBD because we liked the people, their bid was the most comprehensive (the best we got from anyone else was an itemized list - KBD actually drew up some schematics and did some computer modeling, if I recall correctly), and it was mid-range-priced.
The design process was great. We would go in, they would outline whatever options we were picking for the day in an easy-to-understand way, and we'd choose what we wanted - with some suggestions and tips from their designers. Generally after we chose some things they'd update our computer images, and it made it great to visualize.
Now that the kitchen is finally done, everything looks great! Just as we imagined it, and almost identical to the computer images they had generated. There are a few little rough edges, but overall it's a million times better than it used to be.
However, I only give them 2 stars because of what a chore the process was. First of all, I believe they quoted us 7-8 weeks, when in reality it took FIFTEEN WEEKS. Can you imagine being without your kitchen (which, by the way, we have to cross through to go almost anywhere in our house) for over 3 months?! It was torture. Doubling the estimated time ALONE should be worth a 2-star review, but there's more.
The electrician they used (Christian was his name) is among the least reliable people I've ever interacted with. When his part came in the beginning, he was supposed to work Thursday and Friday and be done with his initial rough-in. He calls me on Friday and asks if he can work through the weekend, both Saturday and Sunday. How can he be two days behind on what was supposed to be a two-day job? Then when he was supposed to come at the end to finish up his stuff, we were told he'd be there Thursday and Friday again, and be done. We have security cameras on our house, and I saw him pull in Thursday at about 2PM, and leave at about 3:30. Then on Friday he didn't show up at all. Keep in mind that by this point we're several weeks over the estimated completion date - so wouldn't you think our build would be a priority? Then when he was supposedly done, the chandelier was about two feet off where it was supposed to be, and the oven vent hood didn't work at all, so he had to come back.
Aside from the empty days and insanely long build time, the biggest issue was cleanliness. I'm almost certain that in our contract it said they would clean before they left every day (this didn't happen a single time - I was stuck vaccuuming the entire house almost every day if I didn't want splinters and sawdust everywhere), and it says to expect "white glove cleaning" at the end. That "white glove cleaning" left dust on almost every surface in the kitchen, and in every surrounding room. We're still Swiffering dust away.
Now I need to reiterate that, as far as the build goes, we're pleased with the final result, and everyone we interacted with (except Christian the electrician) was a joy to work with. If you have no time frame, KBD is a great choice. But I can tell you going out to eat gets old after about the first week, so expect to hate it by week 15.
Another small gripe is the only calendar/documentation we got was a physical binder. This would be MUCH better done electronically, and each day could be updated as they knew what would happen (plumber this day, cabinets this day, etc). And, of course, our binder's calendar didn't go past 12/31 - but of course our build went to the end of January, so we had zero clue what would be happening in the last few weeks.
Also (sorry for the stream-of-consciousness review here - just thought of this), for some reason they had no plans to do any painting. It was just assumed that we would be hiring our own painters? I have no idea if that's standard practice or not, but it was a surprise to us, and then suddenly we had to find our own painters. They did give us a contact name, but when we reached out to whoever it was, we never heard back. Maybe it was Christian's brother. Hah. read more