Three days and $2400, got me a bid to get a metal structure erected from Bobby Treder and Kingdom Welding. The building was to consist of legs, a frame and purlins. No walls, just legs and a frame for a metal roof. I had help on hand, tractors available, material on site, and all the things to help get a job done. There was a little fabrication involved. At the end of the three day period, I got some metal plates in the ground and three legs welded on that were not the requested length. Although he is a friendly personality and good with metal, efficiency and ability to manage a job don't seem to be worth the cost. read more