1. Jlc Custom Flooring And Remodeling

0

,

Jlc Custom Flooring And Remodeling

4.3 (4 reviews)
Open • 8:00 am - 5:00 pm

Request quote & availability

You can now request a quote from this business directly from Yelp

Services - Jlc Custom Flooring And Remodeling

Jlc Custom Flooring And Remodeling Photos

You might also consider

Recommended Reviews - Jlc Custom Flooring And Remodeling

Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
Yelp app icon
Browse more easily on the app
Review Feed Illustration

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

1 year ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

3 years ago

Helpful 0
Thanks 0
Love this 0
Oh no 0

Ask the Community - Jlc Custom Flooring And Remodeling

You might also consider

Elite Floors & More - This was a full wall. Half wall removed and stove and dishwasher switched places.

Elite Floors & More

(14 reviews)

We hired Shannon to take care of a few projects in our home. First, was a full bathroom remodel for…read moreboth of our bathrooms in our home. She does amazing tile work and she really helped me bring what I wanted to life. There were times where she knew exactly what I was looking for even though I didn't know how to describe it very well (total lack of imagination on my part ha). Somehow, she even made our tiny shower space in our master bathroom feel more spacious! Her team's drywall work is flawless as well. Shannon's attention to detail sets her apart from the rest and she always made sure to keep the space as clean as possible throughout the process. She also took care of some other renovations that we have going on such as painting, our kitchen backsplash, and a few other sentimental projects that are still underway including the pictured accent wall that I love soooo much. A million stars for Shannon. Thank you so much.

I contracted with this company for tile work in my bathroom and bedroom. The bathroom was to…read morereplace tile in the shower area, floor tile to include baseboards and bedroom floor. I later included the resurfacing of the bathroom walls which was an additional charge. The work commenced on a Wednesday and was supposed to take 7-9 days for the bathroom with the bedroom commencing about a week after the bathroom was completed but the actual time was 12 days. The added work was discussed and approved prior to the contractor giving the 7-9 day time frame. The work was progressing very slowly during the first week and only after my questioning the pace did the progress meet what I would expect of a contractor. I will say the end result looks nice but my concern is the bones of the work. The waterproof board installed was a good product but from what I have researched online was not installed the best way possible. The board was not brought down to the tub lip but instead had a large gap between the tub and the first board. To my knowledge the board should cover the tub lip and have ~1/8th gap between the tub surface and the board and this is not the case. I was told they would fill that with the caulk used for the product but IMO this was just not the proper way to do it; acceptable perhaps; but not proper. The joints were also filled with a bead of the caulk and from what I see should have looked more akin to a dry wall joint type installation. With that said the tiles look nice but I am concerned with longevity. The contractor also ran a wire to a new mirror I was having installed and the installer did not use a plastic bushing when pulling the wire through the box and did not tighten the connections. I only noticed this due to me changing the switch and outlet to match the new color and found charring on the GFCI outlet they pulled power from due to the wire not being connected properly; see picture. The missing bushing could have caused a cut in the wire over time and arcing which could potentially cause a fire. After the bathroom was completed and prior to my discovery of the electrical issues I asked when they want to start the bedroom at which time I was informed it would be a month because they found a bigger job. I found this unacceptable and cancelled the remaining work. I think the contractor CAN do nice work but they do not pay attention to detail and will take shortcuts so would not recommend them.

Jlc Custom Flooring And Remodeling - flooring - Updated October 2026

Loading...
Loading...
Loading...