Ray Tajmir of 'Tajmir-Davis &Associates Engineering' was the Architect my builder used to customize a model home plan the builder offered. While the builder turned out to be a Liar, Bully and Thief. Ray, was complicit in the nightmare this build turned out to be. To me, it is unconscionable that Mr. Tajmir, turned out our plans with dozens and dozens of errors. He was so inept he didn't even put the correct Address on the plans but left the previous build location on them. The roof pitch was drawn wrong, it was supposed to be a 6/12 pitch and he drew it as a 7/12. Moreover, on one section of the roof pitch he drew a 2/12 pitch underlying an overhang. This is completely inept! On every package of shingles it has depicted instructions for installation with variations in roof pitch and a shallow 2/12 pitch is Prohibited!
This error on the roof, actually raised the overall height of my house by 3' 4" and caused the ceilings on my upper level to be raised to 12 feet. Moreover, all the windows on this level were raised so high, you can not see out of them, nor does the bedroom windows meet Fire Codes nor can we reach and operate the window latches.
Other errors include; shortened my garage by 3 feet, placed round Tuscan columns on a beach cottage, did not show spray foam insulation and attic venting properly, did not show screen enclosure for back porch, did not show front or back porch stairs properly, did not show rough openings for the other windows and doors in the cement block walls, did not show a shower properly but showed a tub, did not show out side shower nor garage tub sink, did not show external generator on wiring diagram, did not show a kitchen wall, did not move a wall in a closet, did not show a second air conditioning system and countless other errors on exterior and interior finishes.
With all these errors still on the plans the builder submitted them to the county and they were sealed. A few weeks latter, we finally got a second meeting scheduled to review the plans. Up to this point we had had a 30 min meeting at the model home and seen 4 pdf files attached to emails. When we walked in to the builders office, we expected to meet Ray and E. (the GC) and L. (the builder). Instead, it was just the builder and he had the 3 sets of sealed plans laying on a table. That is when the builder told us they were sealed and (lied) when he said "there is no way to unseal the plans now". My outrage was tempered with the builders charismatic assurances that his field guy E., "could fix anything". And many more assurances IE; "You will get the house you want, I promise".
This of course doesn't have a happy ending. The Builder stole $66,000.00 of my cash! My home has 5 serious structural issues that were hidden from the county inspectors and latter uncovered. read more