To summarize: Way off on estimate - 50% over on construction supplies, and 40% over on labor. Tile in shower- not flush. Used 50% more tile than square footage called for due to errors in cutting/laying tile. Left big gaps when cutting drywall that had to be patched. Looks ok now, but more likely to crack. Did a poor job patching around light switch. Trim work left with rough cuts, then just painted over. Also left big gaps when cutting trim, and didn't do angle cuts properly, then filled with lots of caulk. Didn't properly protect my floor when they set up wet saw in the bedroom, and caused extreme warping of the floor. Said they would fix it like it never happened. What was a finished tongue-in-groove floor has been put back down, but they broke many of the tongues and grooves, and left gaps, and replacement pieces in one area that don't match color. Also did not restore to original finish-only rough sanded then 1 coat Linseed oil (Not polyurethane as original) read more