Cancel

    Search

    3Ds Construction

    5.0 (1 review)
    Closed 6:00 am - 9:00 pm

    Request a consultation

    You can now request a consultation from this business directly from Yelp

    Services - 3Ds Construction

    Deck construction

    Deck design

    Deck repair

    3Ds Construction Photos

    You might also consider

    Recommended Reviews - 3Ds Construction

    Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
    Yelp app icon
    Browse more easily on the app
    Review Feed Illustration

    2 years ago

    Dan did an excellent job I would recommend him to anybody. He finished the job and excellent time

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    Ask the Community - 3Ds Construction

    You might also consider

    RMG Flooring And Remodeling

    RMG Flooring And Remodeling

    1.0
    (1 review)

    We went through Home Depot to have out kitchen floor replaced. Home Depot uses Crew 2 as a…read morecontractor and they hired Matt Grosskopf as a subcontractor. We were told by Home Depot that the uneven floor would be taken care of before the tile was laid. Matt came on 7/10/19 and installed our tile floor in 2 days and once everything had dried and we could go into the room, we noticed many of the tiles were not level and after a few days the tiles were making popping sounds. It was finally agreed that they would tear out the floor and reinstall but we had to use the same installer so he could "have the opportunity to fix his problem". Finally, on 9/25/19, Matt came to tear out the floor and start over . This time he put mortar under the cement board (an important step that is required but was skipped the first time). He also did not secure the cement board with screws properly. I found out from Home Depot that they screws should be placed about 8-10 inches apart but were actually about 20-35 inches apart. They said that that is essential for a sturdy foundation for the tile. Because of some moisture in the floor we had to delay the tile. Our cabinets were rescheduled to be installed on 10/17/19 and Matt promised that he would have the floor in before then but did not keep that promise. I had to push the rest of the kitchen remodel back again. The day he was supposed to come, he didn't show up, so after many phone calls, Crew 2 found two guys to complete what he had started. He couldn't believe what a bad job he had done with securing the cement board and it took them 1.5 hours to finish it. They laid the tiles using the proper steps, important ones that Matt had also skipped. Although the floor was a lot better, it is still not right because Matt decided to not level the floor in the beginning like he should have and we were told he would. Crew 2 will not fix the floor and we are still trying t work out compensation. The complete kitchen remodel was supposed to be completed in about a month but because Matt skipped many steps and did not do quality work, it ended up taking 4.5 months. That is 4.5 months without a working kitchen which is inconvenient in itself, but I run a daycare in my home, which made it a lot worse. Please do not hire this guy if you want to have a quality job done on what you have spent your money on!!

    From the owner: We do bathroom and kitchen remodeling. All hard surface flooring installation, hardwood, LVP, and…read moretile. Tile showers, and kitchen backsplashes. We also do full tile and mosaic walls.

    3Ds Construction - decksrailing - Updated June 2026

    Loading...
    Loading...
    Loading...