Project; replace a 27+ year old block wall (82') leaning due tree roots and bad construction. So this was 2 projects; demolition /hauling (including old footings), and building new footings and wall. Estimated time 2 days demo, and 3 days construction (10% down balance at the end) . Everything went as scheduled. Why am I so pleased?
- Not dealing with contractors that don't seem to have a deep bench (ie. I need x $$ to buy materials; going to home deport to rent this or that).
- Owning their equipment for the demolition and construction
- Activities staged timely (demo and building)
- Meticulous, checking every single brick for proper leveling
Will post some pics of the demo and build. I plan to call Armando for future projects in my backyard. (almost forgot, we did get other quotes and his was competitive).
Final product; the new wall is not going anywhere, I'll be long gone, but this block wall will remain standing straight. read more