They did a bathroom remodel for my mom that turned out horrendous. It has taken over a month for a remodel that shouldn't take more than 2 weeks at the very most. They were never there when they said they would be be and would only work on it a few hours at a time. The drywall mudding was done poorly and you can see where the mud spots are even after being painted. My mom asked for the mirror to be recessed but because they didn't cut the hole for it, they just mounted it on the wall. They also made the hole for the light too low so the one chosen had to be changed so the lights wouldn't hang over the mirror. They put a hole in the drywall in the linen closet and didn't fix it until told they had to. The floor tile was laid unevenly and one had to be taken out due to an eighth of an inch height difference and when put back in, they didn't regrout it. The shower is by far the worst part. There's a quarter inch gap between the floor tile and the shower edge tile. The shower floor is completely uneven and has low spots so the water doesn't drain off of it and instead of connecting the mosaics so it flows together, you can see where they laid each individual piece (it's a white rock mosaic look). All of the wall tile is uneven and I mean in every way possible. Some pieces stick out further and others are sticking out on one side and pressed in on the other. There are two cubbies for the shower wall where the Schluter edging on each sticks out considerably on one part and recessed behind the tile on another. The Schluter edge along the shower itself is never actually against the tile, there's a gap that they just filled with grout that varies in thicknesses because the tiles weren't all cut to make a straight edge. Now let's talk about the grout job in the shower. Sloppy is an understatement. They wiped and smeared grout all over the tiles and didn't use the cleaner to get it off and the grout in the cubbies are in big globs in the back corners and smeared all over the top tiles. There's also grout all over the ceiling where the tile meets it. You can see the orange Kerdi sheet at the stop because it wasn't cut correctly. The shower door isn't on right and leaked because it wasn't sealed. The temperature handle wasn't put in correctly and wouldn't get hotter than room temperature water. When they came to fix that issue, the guy came out with the grout sealer bottle to read the instructions (which makes me think they've never done this before) when we were told 4 days prior that they already put the sealer on. So because of all of this, they were fired. Now we've found that the shower is leaking into the bedroom behind the bathroom. When Jeff was contacted about it all he said was "Sorry but I was fired". No self respecting contractor would say this, they would try to make it right.
So, for your best interest, do NOT go through this company. read more