Cancel

    Search

    Mitsu Finish Carpentry

    5.0 (3 reviews)
    Open 12:00 am - 11:45 pm

    Get pricing

    You can now request a quote from this business directly from Yelp

    Services - Mitsu Finish Carpentry

    Carpenters

    Mitsu Finish Carpentry Photos

    You might also consider

    Recommended Reviews - Mitsu Finish Carpentry

    Your trust is our priority, so businesses can't pay to alter or remove their reviews. Learn more about reviews.
    Yelp app icon
    Browse more easily on the app
    Review Feed Illustration

    2 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    2 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    2 years ago

    Helpful 0
    Thanks 0
    Love this 0
    Oh no 0

    Ask the Community - Mitsu Finish Carpentry

    You might also consider

    Done Right Mike - After 2/2.
 Mike made the single cabinet width exact so the the trim and moulding pieces fit perfectly against the wall.

    Done Right Mike

    (16 reviews)

    I needed some kitchen cabinets removed except for 1/2 of a double cabinet. Job also required…read moredrywall and finishing work where cabinets were removed. Mike not only was the lowest quote, but he was the only one able to quote the entire scope. And what a fantastic job he did. Mike essentially built a custom single cabinet and utilized the existing molding and trim pieces; so one would never know it wasn't the original cabinet installation. Not only meticulous work but his innovativeness to build the single cabinet was impressive. Mike is your guy if you want it done right!

    "EXPERIENCED & SKILLED HANDYMAN"…read more WOWWWW!!! A RARE LOCAL UNICORN!!!! Thank you Mike!!!! Handyman Mike 916-301-9929 Clermont, FL will travel as far as Orlando EXPERIENCE: 10 QUALITY FINISH: 10 FRIENDLY: 10 TOOLS: 10 He owns all his own tools like a Pro should! RELIABLE: 10 Usually early errr.. lol PRICE: 10 You get what you pay for but he's usually done in half the time of others, do the math as I have. You save $$$ A lot! Negatives: He is not thrilled with small jobs but will do. Make sure you are available to let him in, as he is on time, and if your not he goes by the 3 strikes rule. Grumpy if he thinks you're a telemarketer calling lol SKILLS: 10 Cabinetry, Painting, wood or tile flooring install, Plumbing, Electrical, framing, roofing, gutter repair, ceiling repair, and taping, Spray or hand painting, re veneer cabinets, Carpet install, etc after nearly a decade I'm not sure if there is anything he doesn't know how to do? **I'm a real Yelper and say it the way it is. I put up as many negative reviews as I do positive, unlike others... I'll let my reputation speak for itself. Note: Mike is about 65 and does circles around younger labor all while telling them how to do their job correctly because he has solid experience and isn't learning on the job! EXPERIENCED!!! Note: If you're going to ask him over to fix your "small" plumbing job and offer pennies and also tell him it's just a one pipe thing and it's an entire bathroom falling apart? Probably shouldn't call him unless you clearly communicate your needs honestly lol. say Eric Sent you. Mike 916-301-9929 Clermont, FL

    TEK Construction group - Custom Closet

    TEK Construction group

    (18 reviews)

    We got our bathroom remodeled by TEK starting late September and we were left with a gorgeous…read morebathroom for a great price. The staff at TEK are all very kind and accommodating. Especially Wes who was our point of contact from the start. Wes answered all of our question, was honest and helpful from the get go. Highly recommend working with him or anyone else on the team. The work that was done was beautiful, the bathroom turned out exactly as we imagined it and we can't really ask for more than that. We were interrupted twice because of hurricanes which delayed the work but no one can help that. The biggest issue we had was communication from the team. From what I understood, TEK utilizes third party contractors to do specific jobs like drywall, electric, plumbing, etc. So some times people were coming on days we were told no one was coming. Some days we were told someone was coming at 8 and they'd never show. The reason that was most frustrating was because we had to plan our day around when a contractor would be home, like our daughter's nap schedule, our dog's potty schedule, and even our work schedules. We're lucky enough to have a ton of flexibility but if we hadn't, that really would've dragged the project out. Other than the communication about when the team would be coming though, I have no complaints about TEK or the work that was done. I think the communication bit is an easy fix and I do understand the hurricanes made it especially difficult some weeks. Overall: we got a beautiful bathroom done for a great price, the TEK team was great and the only issue we had was some miscommunication.

    This is my personal experience with Tek Contracting/Tek Construction Group…read more I will keep this straight to the point and let the photos speak for themselves. This is a kitchen & bathroom reno + flooring for my 750 sqft apartment. I selected my materials at their warehouse during my design session. What was supposed to be a 4 week job is now coming up to 4 months. The majority of these photos are from the final walkthrough June 3rd, 2025. You will see: Mis-match color cabinets installed, which are also not aligned, Incorrect countertop installed, using scrap pieces, Backsplash grout already cracking, Missing hardware for cabinets, Microwave cannot open entirely, and the outlet does not work, Required GFCI outlets missing - major safety hazard, Incorrect color & style bathroom floor tile installed, Mis-match shower tile installed, Shower niche missing, Grout in shower already cracking, Shelving in bathroom vanity missing, Baseboards unfinished and completely missing in areas, Incorrect color LVP flooring installed, Back door hinges are missing screws - major safety hazard, I caught the back door open one night (who knows how many times that has happened), Open wiring in the attic - major fire hazard, These are ONLY the materials & issues that have not been corrected along the way. There were plenty more issues. Addressing them with the owner did not help. Used materials installed from previous jobs without consent (verbal and physical evidence of this). They have requested all invoices early/ before they were due. The 3rd draw was requested early 4 times. On the 4th request personally from the owner, I paid early under his confirmation that cabinets would arrive in 2 days. It took a few weeks before the cabinets were installed, and installed incorrectly. It took another 6 weeks to 'correct', and at the final walkthrough, they are mis-matched colors, not all have shelving, and they are unaligned.

    Mitsu Finish Carpentry - carpenters - Updated May 2026

    Loading...
    Loading...
    Loading...