The new Hetton Coalfield swimming pools construction works is progressing very well.
For a look at how things have developed from the start to the present time check this link out for pictures. http://hetton-online.com
December pictures now showing.
Looks like being completed late November but will probably not open till January.
Completed now and is opening January 10th or 17th 2010. Pellikaan Construction Ltd UK have done a very professional job of the building and should be commended. New webpage address for this information is http://www.hetton-online.com
Official opening day on thursday 14th January and it looks worth the wait. hopefully I will get some more good pictures.:) The pools and fitnesse centre are now open to the public so lets hope its put to good use by local people. Unfortunately due to a change of government, concessions to under 16's and over 60's will cease at the end of July so a lot of families and over 60's will be disappointed as the cost to some will be out of their reach. The proposed new glass along the side of the building (being designer and wont be cheap and there are MUCH cheaper materials available) is on show in the building, but maybe if this cost was used instead for concessions for people who qualify maybe it would be a better idea in this time of allround cutbacks! Bearing in mind an already public viewing area inside is available where the public can pay to watch what is happening in the building. read more